If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495121015000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.204877,"lon":-115.665714,"icon":""}]} |
Location: 00/15-10-049-12W5/0 | |
Location Alias: 00/15-10-49-12 W5M | |
Location Alias 2: 00/15-10-049-12 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 12 | |
Section: 10 | |
County/Municipality: Yellowhead County | |
Well Name: RIDGEBACK PEMBINA 15-10-49-12 | |
Operator Name: Ridgeback Resources Inc. | |
License Number: 0442303 | |
License Date: 2012-01-04 | |
License Status: Issued | |
Spud Date: 2012-02-09 | |
Final Drill Date: 2012-02-19 | |
Well Total Depth: 3502.00 m | |
Surface Hole Latitude: 53.204877 | |
Surface Hole Longitude: -115.665714 |
Date | Event |
---|---|
2012-01-04 | Obtained License |
2012-02-09 | Surface Casing Operation Performed |
2012-02-11 | Well Log Performed |
2012-02-13 | Direction Drilling Operation Performed - Horizontal |
2012-02-19 | Finished Drilling |
2012-02-19 | Well Log Performed |
2012-02-19 | Well Mode changed to Drilled and Cased |
2012-02-21 | Perforation Treatment Performed - Open-Hole Completion |
2012-02-21 | Production Casing Operation Performed |
2012-02-22 | Rig Released |
2012-02-29 | Well Log Performed |
2012-03-06 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-07 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-03-08 | Well Began Production |
2012-03-08 | Well Fluid changed to Crude Oil |
2012-03-08 | Well Mode changed to Flowing |
2012-03-10 | Well Log Performed |
2012-04-09 | Well Fluid changed to Crude Oil |
2012-04-09 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-02-09 | Precision Drilling Corporation | 184 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-02-13 | 2093.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-02-21 | Open Hole/Barefoot Completion | 3498.50 | 3502.00 | 0 |
2012-03-07 | Multi-Stage Fracture | 2925.20 | 2925.30 | 0 |
2012-03-07 | Multi-Stage Fracture | 2867.60 | 2867.70 | 0 |
2012-03-07 | Multi-Stage Fracture | 2796.90 | 2797.00 | 0 |
2012-03-07 | Multi-Stage Fracture | 2726.20 | 2726.30 | 0 |
2012-03-07 | Multi-Stage Fracture | 2655.40 | 2655.50 | 0 |
2012-03-07 | Multi-Stage Fracture | 2584.60 | 2584.70 | 0 |
2012-03-07 | Multi-Stage Fracture | 2526.80 | 2526.90 | 0 |
2012-03-07 | Multi-Stage Fracture | 2455.80 | 2455.90 | 0 |
2012-03-07 | Multi-Stage Fracture | 2384.90 | 2385.00 | 0 |
2012-03-07 | Multi-Stage Fracture | 2314.00 | 2314.10 | 0 |
2012-03-06 | Multi-Stage Fracture | 3472.30 | 3472.40 | 0 |
2012-03-07 | Multi-Stage Fracture | 2256.20 | 2256.30 | 0 |
2012-03-07 | Multi-Stage Fracture | 2185.20 | 2185.30 | 0 |
2012-03-06 | Multi-Stage Fracture | 3407.80 | 3407.90 | 0 |
2012-03-06 | Multi-Stage Fracture | 3337.40 | 3337.50 | 0 |
2012-03-06 | Multi-Stage Fracture | 3266.60 | 3266.70 | 0 |
2012-03-07 | Multi-Stage Fracture | 3195.80 | 3195.90 | 0 |
2012-03-07 | Multi-Stage Fracture | 3138.10 | 3138.20 | 0 |
2012-03-07 | Multi-Stage Fracture | 3068.00 | 3068.10 | 0 |
2012-03-07 | Multi-Stage Fracture | 2996.30 | 2996.40 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 6507 | 0.0 | 0.0 | 0.0 |
2013 | 8310 | 0.0 | 0.0 | 0.0 |
2014 | 8456 | 0.0 | 0.0 | 0.0 |
2015 | 8724 | 0.0 | 0.0 | 0.0 |
2016 | 8737 | 0.0 | 0.0 | 0.0 |
2017 | 8705 | 0.0 | 0.0 | 0.0 |
2018 | 8753 | 0.0 | 0.0 | 0.0 |
2019 | 8725 | 0.0 | 0.0 | 0.0 |
2020 | 2169 | 0.0 | 0.0 | 0.0 |
For data sources see[7]