X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495120901000

Well Details

Well ID: 0495120901000
Loading map...
Location: 00/01-09-049-12W5/0
Location Alias: 00/01-09-49-12 W5M
Location Alias 2: 00/01-09-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 09
County/Municipality: Yellowhead County
Well Name: VEI HZ PEMBINA 1-9-49-12
Operator Name: Vermilion Energy Inc.
License Number: 0490120
License Date: 2018-07-23
License Status: Issued
Spud Date: 2018-11-07
Final Drill Date: 2018-11-15
Well Total Depth: 4128.00 m
Surface Hole Latitude: 53.228848
Surface Hole Longitude: -115.689756

For data sources see[1][2]

Well History

Date Event
2018-07-23 Obtained License
2018-11-07 Conductor Casing Operation Performed
2018-11-10 Direction Drilling Operation Performed - Deviate
2018-11-13 Direction Drilling Operation Performed - Horizontal
2018-11-15 Finished Drilling
2018-11-15 Well Log Performed
2018-11-15 Well Mode changed to Drilled and Cased
2018-11-16 Production Casing Operation Performed
2018-11-16 Rig Released
2019-01-05 Perforation Treatment Performed - Multi-Stage Fracture
2019-01-06 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-01 Well Began Production
2019-02-01 Well Fluid changed to Crude Oil
2019-02-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-07 Ironhand Drilling Inc. 5 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-11-10 1604.60 Deviate (5 - 79 degrees)
2018-11-13 2017.80 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-01-05 Multi-Stage Fracture 4056.70 4056.80 0
2019-01-05 Multi-Stage Fracture 3538.60 3538.70 0
2019-01-05 Multi-Stage Fracture 3481.80 3481.90 0
2019-01-05 Multi-Stage Fracture 3425.30 3425.40 0
2019-01-05 Multi-Stage Fracture 3366.40 3366.50 0
2019-01-05 Multi-Stage Fracture 3309.00 3309.10 0
2019-01-05 Multi-Stage Fracture 3254.20 3254.30 0
2019-01-05 Multi-Stage Fracture 3211.00 3211.10 0
2019-01-05 Multi-Stage Fracture 3136.80 3136.90 0
2019-01-06 Multi-Stage Fracture 3078.50 3078.60 0
2019-01-06 Multi-Stage Fracture 3022.30 3022.40 0
2019-01-05 Multi-Stage Fracture 4013.50 4013.60 0
2019-01-06 Multi-Stage Fracture 2963.40 2963.50 0
2019-01-06 Multi-Stage Fracture 2906.40 2906.50 0
2019-01-06 Multi-Stage Fracture 2850.20 2850.30 0
2019-01-06 Multi-Stage Fracture 2797.80 2797.90 0
2019-01-06 Multi-Stage Fracture 2741.50 2741.60 0
2019-01-06 Multi-Stage Fracture 2685.80 2685.90 0
2019-01-06 Multi-Stage Fracture 2628.30 2628.40 0
2019-01-06 Multi-Stage Fracture 2571.60 2571.70 0
2019-01-06 Multi-Stage Fracture 2514.30 2514.40 0
2019-01-06 Multi-Stage Fracture 2456.30 2456.40 0
2019-01-05 Multi-Stage Fracture 3956.90 3957.00 0
2019-01-06 Multi-Stage Fracture 2398.50 2398.60 0
2019-01-06 Multi-Stage Fracture 2342.30 2342.40 0
2019-01-06 Multi-Stage Fracture 2289.00 2289.10 0
2019-01-06 Multi-Stage Fracture 2232.90 2233.00 0
2019-01-06 Multi-Stage Fracture 2174.60 2174.70 0
2019-01-06 Multi-Stage Fracture 2120.30 2120.40 0
2019-01-06 Multi-Stage Fracture 2075.70 2075.80 0
2019-01-06 Multi-Stage Fracture 2030.70 2030.80 0
2019-01-05 Multi-Stage Fracture 3912.60 3912.70 0
2019-01-05 Multi-Stage Fracture 3850.80 3850.90 0
2019-01-05 Multi-Stage Fracture 3776.00 3776.10 0
2019-01-05 Multi-Stage Fracture 3720.20 3720.30 0
2019-01-05 Multi-Stage Fracture 3676.50 3676.60 0
2019-01-05 Multi-Stage Fracture 3614.00 3614.10 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-01-05 2019-01-06 1,906 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* 7732-18-5 100 84.9439 N/A
Slickwater. N002 Schlumberger Quartz. Crystalline silica 14808-60-7 100 12.6566 N/A
Slickwater. N002 Schlumberger Energizing Fluid 1.2.4 Trimethylbenzene (impurity) 95-63-6 100 0 N/A
2-hydroxy-N.N.N-trimethylethanaminium chloride 67-48-1 100 0.0649 N/A
2-Propen-1-aminium. N.N-dimethyl-N-2-propen-1-yl-. chloride 26062-79-3 100 0.0004 N/A
2-Propenamid (impurity) 79-06-1 100 0 N/A
Acetic acid (impurity) 64-19-7 100 0.0015 N/A
Acetic acid. potassium salt 127-08-2 100 0 N/A
Acetophenone 98-86-2 100 0 N/A
Acrylamide. 2-acrylamido-2-methylpropanesulfonic
acid. sodiu
38193-60-1 100 0.0158 N/A
Alcohol. C11-14. ethoxylated 78330-21-9 100 0.0032 N/A
Alcohol. C9-C11. Ethoxylated 68439-46-3 100 0.0001 N/A
Alcohols. C10-16. ethoxylated 68002-97-1 100 0 N/A
Alcohols. C7-9-iso-. C8-rich. ethoxylated 78330-19-5 100 0.0026 N/A
Alcohols. C9-11-iso-. C10-rich 68526-85-2 100 0.0007 N/A
Alcohols. C9-11-iso-. C10-rich. ethoxylated 78330-20-8 100 0.0024 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Amines. tallow alkyl. ethoxylated 61791-26-2 100 0 N/A
Benzenemethanaminium. N.N-dimethyl-N tetradecyl-. chloride 139-08-2 100 0.0002 N/A
Benzenemethanaminium. N-hexadecylN.N dimethyl-.chloride 122-18-9 100 0 N/A
benzododecinium chloride 139-07-1 100 0.0005 N/A
Cinnamaldehyde 104-55-2 100 0.0001 N/A
Copper(II) sulfate 7758-98-7 100 0 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0003 N/A
Disodium hydroxyethylethylenediaminediacetate (impurity) 62099-15-4 100 0.0001 N/A
Distillates. petroleum. hydrotreated light 64742-47-8 100 0.014 N/A
Ethoxylated propoxylated 4-nonylphenol-formaldehyde resin 30846-35-6 100 0.0028 N/A
Formaldehyde (impurity) 50-00-0 100 0 N/A
Glycine. N-[2-[bis(carboxymethyl)amino]ethyl]-N-(2-hydroxye
t
139-89-9 100 0.0022 N/A
Hydrochloric acid 7647-01-0 100 0.0854 N/A
Methanol 67-56-1 100 0.0291 N/A
N-Coco. 1.3-diaminopropane di-acetate 61791-64-8 100 0.0035 N/A
Naphthalene (Impurity) 91-20-3 100 0 N/A
Nitrilotriacetic acid trisodium salt (Impurity) 5064-31-3 100 0 N/A
Nitrogen. liquid form 7727-37-9 100 2.1472 N/A
Oxirane. Methyl-. polymer with Oxirane 11/6/9003 100 0.0039 N/A
Poly(oxy-1.2-ethanediyl).a-hydro-w-hydroxy-
Ethane-1.2-diol.
25322-68-3 100 0.0008 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0047 N/A
Potassium oleate 143-18-0 100 0 N/A
Propan-2-ol 67-63-0 100 0.0002 N/A
Reaction product of: acetophenone.
formaldehyde. cyclohexyla
224635-63-6 100 0.0002 N/A
Sodium chloride 7647-14-5 100 0.0083 N/A
Sodium Glycolate (impurity) 2836-32-0 100 0.0001 N/A
Sodium hydroxide (impurity) 1310-73-2 100 0 N/A
Solvent naphtha (petroleum). heavy arom. 64742-94-5 100 0.0005 N/A
Sorbitan monooleate 1338-43-8 100 0.0008 N/A
Sorbitan monooleate. ethoxylated 9005-65-6 100 0.0006 N/A
Tetrasodium ethylenediaminetetraacetate 64-02-8 100 0 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-01-05 2019-01-05 Central Water Distribution Facility 4297

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7036 0.0 0.0 0.0
2020 1994 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-11-16 No Incident Encountered 0.00 0.00
2019-01-11 No Incident Encountered 0.00 0.00

For data sources see[10]

References