X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495120212000

Well Details

Well ID: 0495120212000
Loading map...
Location: 00/12-02-049-12W5/0
Location Alias: 00/12-02-49-12 W5M
Location Alias 2: 00/12-02-049-12 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 12
Section: 02
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 12-2-49-12
Operator Name: Ridgeback Resources Inc.
License Number: 0437869
License Date: 2011-10-21
License Status: Issued
Spud Date: 2012-06-14
Final Drill Date: 2012-06-27
Well Total Depth: 3502.00 m
Surface Hole Latitude: 53.203401
Surface Hole Longitude: -115.630795

For data sources see[1][2]

Well History

Date Event
2011-10-21 Obtained License
2012-06-14 Kick Occurred
2012-06-17 Surface Casing Operation Performed
2012-06-18 Well Log Performed
2012-06-19 Direction Drilling Operation Performed - Deviate
2012-06-20 Direction Drilling Operation Performed - Horizontal
2012-06-27 Finished Drilling
2012-06-27 Well Log Performed
2012-06-27 Well Mode changed to Drilled and Cased
2012-06-28 Perforation Treatment Performed - Open-Hole Completion
2012-06-28 Production Casing Operation Performed
2012-06-29 Rig Released
2012-07-10 Well Log Performed
2012-07-23 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-24 Perforation Treatment Performed - Multi-Stage Fracture
2012-07-25 Well Began Production
2012-07-25 Well Fluid changed to Crude Oil
2012-07-25 Well Mode changed to Flowing
2012-07-27 Well Log Performed
2017-04-01 Well Fluid changed to Crude Oil
2017-04-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2012-06-14 Precision Drilling Corporation 403 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2012-06-19 1445.00 Deviate (5 - 79 degrees)
2012-06-20 2041.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-06-28 Open Hole/Barefoot Completion 3499.00 3502.00 0
2012-07-23 Multi-Stage Fracture 2918.30 2918.40 0
2012-07-23 Multi-Stage Fracture 2856.90 2857.00 0
2012-07-24 Multi-Stage Fracture 2856.90 2857.00 0
2012-07-24 Multi-Stage Fracture 2782.30 2782.40 0
2012-07-24 Multi-Stage Fracture 2720.50 2720.60 0
2012-07-24 Multi-Stage Fracture 2644.50 2644.60 0
2012-07-24 Multi-Stage Fracture 2582.80 2582.90 0
2012-07-24 Multi-Stage Fracture 2507.70 2507.80 0
2012-07-24 Multi-Stage Fracture 2445.90 2446.00 0
2012-07-24 Multi-Stage Fracture 2370.30 2370.40 0
2012-07-23 Multi-Stage Fracture 3473.30 3473.40 0
2012-07-24 Multi-Stage Fracture 2309.40 2309.50 0
2012-07-24 Multi-Stage Fracture 2233.30 2233.40 0
2012-07-24 Multi-Stage Fracture 2157.40 2157.50 0
2012-07-23 Multi-Stage Fracture 3405.40 3405.50 0
2012-07-23 Multi-Stage Fracture 3331.00 3331.10 0
2012-07-23 Multi-Stage Fracture 3269.20 3269.30 0
2012-07-23 Multi-Stage Fracture 3193.40 3193.50 0
2012-07-23 Multi-Stage Fracture 3131.80 3131.90 0
2012-07-23 Multi-Stage Fracture 3056.00 3056.10 0
2012-07-23 Multi-Stage Fracture 2994.20 2994.30 0

For data sources see[6]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 3131 0.0 0.0 0.0
2013 8708 0.0 0.0 0.0
2014 8675 0.0 0.0 0.0
2015 8723 0.0 0.0 0.0
2016 8750 0.0 0.0 0.0
2017 8711 0.0 0.0 0.0
2018 8693 0.0 0.0 0.0
2019 8734 0.0 0.0 0.0
2020 2130 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-14 Kick 32.00 32.00
2012-07-30 No Incident Encountered 0.00 0.00

For data sources see[8]

References