If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495113105000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.24691,"lon":-115.604815,"icon":""}]} |
Location: 00/05-31-049-11W5/0 | |
Location Alias: 00/05-31-49-11 W5M | |
Location Alias 2: 00/05-31-049-11 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 11 | |
Section: 31 | |
County/Municipality: Brazeau County | |
Well Name: VERMILION HZ PEMBINA 5-31-49-11 | |
Operator Name: Vermilion Energy Inc. | |
License Number: 0430038 | |
License Date: 2011-01-14 | |
License Status: Issued | |
Spud Date: 2011-03-21 | |
Final Drill Date: 2011-04-05 | |
Well Total Depth: 4390.00 m | |
Surface Hole Latitude: 53.246910 | |
Surface Hole Longitude: -115.604815 |
Date | Event |
---|---|
2011-01-14 | Obtained License |
2011-03-23 | Surface Casing Operation Performed |
2011-03-24 | Well Log Performed |
2011-03-25 | Direction Drilling Operation Performed - Horizontal |
2011-04-05 | Finished Drilling |
2011-04-05 | Well Mode changed to Drilled and Cased |
2011-04-09 | Production Casing Operation Performed |
2011-04-10 | Rig Released |
2011-05-30 | Well Log Performed |
2011-06-21 | Perforation Treatment Performed - Open-Hole Completion |
2011-06-22 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-06-23 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-06-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-06-27 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-06-28 | Perforation Treatment Performed - Multi-Stage Fracture |
2011-07-01 | Well Began Production |
2011-07-01 | Well Fluid changed to Crude Oil |
2011-07-01 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-03-25 | 1440.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-06-21 | Open Hole/Barefoot Completion | 4385.50 | 4390.00 | 0 |
2011-06-27 | Multi-Stage Fracture | 3558.40 | 3558.50 | 0 |
2011-06-27 | Multi-Stage Fracture | 3458.40 | 3458.50 | 0 |
2011-06-27 | Multi-Stage Fracture | 3357.70 | 3357.80 | 0 |
2011-06-27 | Multi-Stage Fracture | 3257.80 | 3257.90 | 0 |
2011-06-27 | Multi-Stage Fracture | 3158.50 | 3158.60 | 0 |
2011-06-27 | Multi-Stage Fracture | 3072.60 | 3072.70 | 0 |
2011-06-27 | Multi-Stage Fracture | 2973.20 | 2973.30 | 0 |
2011-06-27 | Multi-Stage Fracture | 2873.90 | 2874.00 | 0 |
2011-06-27 | Multi-Stage Fracture | 2774.50 | 2774.60 | 0 |
2011-06-28 | Multi-Stage Fracture | 2675.10 | 2675.20 | 0 |
2011-06-22 | Multi-Stage Fracture | 4373.90 | 4374.00 | 0 |
2011-06-28 | Multi-Stage Fracture | 2575.70 | 2575.80 | 0 |
2011-06-28 | Multi-Stage Fracture | 2476.40 | 2476.50 | 0 |
2011-06-28 | Multi-Stage Fracture | 2377.00 | 2377.10 | 0 |
2011-06-28 | Multi-Stage Fracture | 2291.00 | 2291.10 | 0 |
2011-06-22 | Multi-Stage Fracture | 4241.30 | 4241.40 | 0 |
2011-06-23 | Multi-Stage Fracture | 4142.50 | 4142.60 | 0 |
2011-06-26 | Multi-Stage Fracture | 4043.20 | 4043.30 | 0 |
2011-06-26 | Multi-Stage Fracture | 3944.30 | 3944.40 | 0 |
2011-06-27 | Multi-Stage Fracture | 3845.00 | 3845.10 | 0 |
2011-06-27 | Multi-Stage Fracture | 3745.60 | 3745.70 | 0 |
2011-06-27 | Multi-Stage Fracture | 3659.10 | 3659.20 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 3218 | 0.0 | 0.0 | 0.0 |
2012 | 7868 | 0.0 | 0.0 | 0.0 |
2013 | 8717 | 0.0 | 0.0 | 0.0 |
2014 | 8653 | 0.0 | 0.0 | 0.0 |
2015 | 8602 | 0.0 | 0.0 | 0.0 |
2016 | 8745 | 0.0 | 0.0 | 0.0 |
2017 | 8198 | 0.0 | 0.0 | 0.0 |
2018 | 8646 | 0.0 | 0.0 | 0.0 |
2019 | 7971 | 0.0 | 0.0 | 0.0 |
2020 | 2153 | 0.0 | 0.0 | 0.0 |
For data sources see[6]