X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495112704000

Well Details

Well ID: 0495112704000
Loading map...
Location: 00/04-27-049-11W5/0
Location Alias: 00/04-27-49-11 W5M
Location Alias 2: 00/04-27-049-11 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 27
County/Municipality: Brazeau County
Well Name: KEYERA PEMBINA 4-27-49-11
Operator Name: Keyera Energy Ltd.
License Number: 0095604
License Date: 1982-03-19
License Status: Abandoned
Spud Date: 1982-05-20
Final Drill Date: 1982-06-21
Well Total Depth: 2935.00 m
Surface Hole Latitude: 53.253519
Surface Hole Longitude: -115.533605

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-03-19 Obtained License
1982-06-16 Drill Stem Test Performed
1982-06-21 Finished Drilling
1982-06-23 Well Log Performed
1982-06-24 Production Casing Operation Performed
1982-06-24 Well Mode changed to Drilled and Cased
1982-08-13 Perforation Treatment Performed - Jet Perforation
1982-08-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-08-21 Well Began Production
1982-08-21 Well Fluid changed to Crude Oil
1982-08-21 Well Mode changed to Flowing
1983-01-20 Perforation Treatment Performed - Jet Perforation
1983-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1983-01-21 Perforation Treatment Performed - Cement Squeeze
1984-08-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-05-22 Well Log Performed
1985-05-23 Perforation Treatment Performed - Cement Squeeze
1985-05-28 Perforation Treatment Performed - Jet Perforation
1985-05-28 Well Log Performed
1985-05-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-06-01 Well Began Injection
1985-06-01 Well Fluid changed to Gas
1985-06-01 Well Type changed to Injection
1986-02-06 Well Log Performed
1986-06-27 Well Log Performed
1987-01-16 Well Log Performed
1987-05-25 Well Log Performed
1988-07-01 Well Log Performed
1988-10-31 Well Log Performed
1989-02-11 Well Log Performed
1989-05-01 Well Log Performed
2010-08-11 Well Log Performed
2010-08-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-12 Plug Back Performed
2010-08-12 Well Fluid changed to Gas
2010-08-12 Well Mode changed to Abandoned Zone
2010-08-12 Well Type changed to Injection
2010-08-13 Perforation Treatment Performed - Jet Perforation
2010-08-13 Well Log Performed
2010-08-14 Perforation Treatment Performed - Remedial Casing
2010-08-15 Perforation Treatment Performed - Cement Plug
2010-08-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-16 Well Log Performed
2010-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-17 Perforation Treatment Performed - Jet Perforation
2010-08-17 Perforation Treatment Performed - Remedial Casing
2010-08-17 Well Log Performed
2010-08-24 Perforation Treatment Performed - Jet Perforation
2010-08-24 Well Log Performed
2010-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-25 Perforation Treatment Performed - Remedial Casing
2010-08-26 Perforation Treatment Performed - Jet Perforation
2010-08-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-27 Perforation Treatment Performed - Remedial Casing
2011-12-10 Well Abandoned
2011-12-10 Well Fluid changed to Gas
2011-12-10 Well Mode changed to Abandoned
2011-12-10 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-08-13 Perforation 2867.00 2872.00 7
2010-08-12 Packing Device Capped w/Cement 2779.60 2822.00 0
2010-08-13 Perforation 2568.00 2569.00 17
2010-08-14 Remedial Casing Cementing 2568.00 2569.00 0
2010-08-15 Cement Plug 2247.00 2779.60 0
2010-08-16 Packing Device Capped w/Cement 1722.00 1730.00 0
2010-08-17 Perforation 1397.00 1398.00 17
2010-08-17 Remedial Casing Cementing 1397.00 1398.00 0
2010-08-17 Packing Device Capped w/Cement 1367.40 1386.40 0
2010-08-24 Perforation 1106.00 1107.00 17
2010-08-25 Remedial Casing Cementing 1106.00 1107.00 0
1982-08-16 Acid Treatment 2867.00 2872.00 0
2010-08-25 Packing Device Capped w/Cement 1088.80 1097.80 0
2010-08-26 Perforation 600.00 601.00 17
2010-08-27 Remedial Casing Cementing 600.00 601.00 0
2010-08-27 Packing Device Capped w/Cement 585.70 593.70 0
1983-01-20 Perforation 1739.50 1740.50 13
1983-01-21 Acid Treatment 1739.50 1740.50 0
1983-01-21 Cement Squeeze 1739.50 1740.50 0
1984-08-02 Acid Treatment 2867.00 2872.00 0
1985-05-23 Cement Squeeze 2867.00 2872.00 0
1985-05-28 Perforation 2836.50 2840.50 7
1985-05-29 Acid Treatment 2836.50 2840.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1982 1088 0.0 0.0 0.0
1983 3604 0.0 0.0 0.0
1984 5762 0.0 0.0 0.0
1985 1256 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0

For data sources see[5]

References