X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495112015000

Well Details

Well ID: 0495112015000
Loading map...
Location: 00/15-20-049-11W5/0
Location Alias: 00/15-20-49-11 W5M
Location Alias 2: 00/15-20-049-11 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 20
County/Municipality: Brazeau County
Well Name: KEYERA PEMBINA 15-20-49-11
Operator Name: Keyera Energy Ltd.
License Number: 0086975
License Date: 1980-11-12
License Status: Issued
Spud Date: 1980-11-18
Final Drill Date: 1980-12-29
Well Total Depth: 3015.00 m
Surface Hole Latitude: 53.248243
Surface Hole Longitude: -115.570073

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-11-12 Obtained License
1980-12-29 Finished Drilling
1980-12-29 Well Mode changed to Drilled and Cased
1981-01-01 Drill Stem Test Performed
1981-01-03 Production Casing Operation Performed
1981-07-06 Perforation Treatment Performed - Jet Perforation
1981-07-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-10 Perforation Treatment Performed - Fractured
1981-07-23 Well Began Production
1981-07-23 Well Fluid changed to Crude Oil
1981-07-23 Well Mode changed to Flowing
1981-08-21 Perforation Treatment Performed - Jet Perforation
1981-09-01 Well Fluid changed to Crude Oil
1981-09-01 Well Mode changed to Flowing
1987-05-27 Well Log Performed
1988-12-09 Perforation Treatment Performed - Chemical Squeeze
1988-12-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-07 Perforation Treatment Performed - Chemical Squeeze
1990-09-09 Perforation Treatment Performed - Chemical Squeeze
1990-09-12 Well Log Performed
1990-09-13 Perforation Treatment Performed - Jet Perforation
1990-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-14 Well Log Performed
1991-03-05 Perforation Treatment Performed - Chemical Squeeze
1991-06-26 Perforation Treatment Performed - Chemical Squeeze
1991-09-26 Perforation Treatment Performed - Chemical Squeeze
1991-11-21 Perforation Treatment Performed - Chemical Squeeze
1992-01-12 Perforation Treatment Performed - Cement Squeeze
1992-01-15 Perforation Treatment Performed - Cement Squeeze
1992-01-17 Well Log Performed
1992-01-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-18 Perforation Treatment Performed - Jet Perforation
1992-01-20 Well Log Performed
1992-01-22 Perforation Treatment Performed - Jet Perforation
1992-01-22 Well Log Performed
1992-01-28 Well Log Performed
1992-01-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-05-05 Perforation Treatment Performed - Chemical Squeeze
1992-09-30 Perforation Treatment Performed - Chemical Squeeze
2001-04-01 Well Fluid changed to Crude Oil
2001-04-01 Well Mode changed to Suspended
2010-03-31 Well Log Performed
2010-04-01 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-07-06 Perforation 2315.00 2325.00 3
1990-09-14 Acid Treatment 2915.50 2925.50 0
1991-03-05 Chemical Squeeze 2915.50 2925.50 0
1991-06-26 Chemical Squeeze 2915.50 2925.50 0
1991-09-26 Chemical Squeeze 2915.50 2919.50 0
1991-11-21 Chemical Squeeze 2915.50 2925.50 0
1992-01-12 Cement Squeeze 2315.00 2325.00 0
1992-01-15 Cement Squeeze 2915.50 2925.50 0
1992-01-18 Perforation 2923.00 2925.50 13
1992-01-18 Acid Treatment 2923.00 2925.50 0
1992-01-22 Perforation 2315.00 2325.00 13
1981-07-07 Acid Treatment 2315.00 2325.00 0
1992-01-30 Acid Treatment 2923.00 2925.50 0
1992-05-05 Chemical Squeeze 2923.00 2925.50 0
1992-09-30 Chemical Squeeze 2923.00 2925.50 0
2010-04-01 Perforation 2902.00 2907.00 17
1981-07-10 Fracture 2315.00 2325.00 0
1981-08-21 Perforation 2915.50 2919.50 4
1988-12-09 Chemical Squeeze 2915.50 2919.50 0
1988-12-10 Acid Treatment 2915.50 2919.50 0
1990-09-07 Chemical Squeeze 2915.50 2919.50 0
1990-09-09 Chemical Squeeze 2915.50 2919.50 0
1990-09-13 Perforation 2921.50 2925.50 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1958 0.0 0.0 0.0
1982 1757 0.0 0.0 0.0
1983 7645 0.0 0.0 0.0
1984 7731 0.0 0.0 0.0
1985 3468 0.0 0.0 0.0
1986 7219 0.0 0.0 0.0
1987 8469 0.0 0.0 0.0
1988 8188 0.0 0.0 0.0
1989 8315 0.0 0.0 0.0
1990 8008 0.0 0.0 0.0
1991 8461 0.0 0.0 0.0
1992 6818 0.0 0.0 0.0
1993 6934 0.0 0.0 0.0
1994 4476 0.0 0.0 0.0
1995 7295 0.0 0.0 0.0
1996 8423 0.0 0.0 0.0
1997 6899 0.0 0.0 0.0
1998 6794 0.0 0.0 0.0
1999 8591 0.0 0.0 0.0
2000 4367 0.0 0.0 0.0

For data sources see[5]

References