X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495110701020

Well Details

Well ID: 0495110701020
Loading map...
Location: 02/01-07-049-11W5/0
Location Alias: 02/01-07-49-11 W5M
Location Alias 2: 02/01-07-049-11 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 11
Section: 07
County/Municipality: Yellowhead County
Well Name: RIDGEBACK PEMBINA 1-7-49-11
Operator Name: Ridgeback Resources Inc.
License Number: 0482445
License Date: 2017-01-18
License Status: Issued
Spud Date: 2018-01-06
Final Drill Date: 2018-01-15
Well Total Depth: 3662.00 m
Surface Hole Latitude: 53.209373
Surface Hole Longitude: -115.616557

For data sources see[1][2]

Well History

Date Event
2017-01-18 Obtained License
2018-01-07 Surface Casing Operation Performed
2018-01-09 Direction Drilling Operation Performed - Deviate
2018-01-09 Direction Drilling Operation Performed - Horizontal
2018-01-15 Finished Drilling
2018-01-15 Well Log Performed
2018-01-15 Well Mode changed to Drilled and Cased
2018-01-16 Perforation Treatment Performed - Open-Hole Completion
2018-01-16 Production Casing Operation Performed
2018-01-16 Rig Released
2018-01-17 Well Log Performed
2018-02-08 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-09 Perforation Treatment Performed - Multi-Stage Fracture
2018-02-23 Well Began Production
2018-02-23 Well Fluid changed to Crude Oil
2018-02-23 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-01-06 Precision Drilling Corporation 183 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-01-09 1411.80 Deviate (5 - 79 degrees)
2018-01-09 2026.60 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2018-01-16 Open Hole/Barefoot Completion 3652.00 3662.00 0
2018-02-08 Multi-Stage Fracture 3326.50 3326.60 0
2018-02-08 Multi-Stage Fracture 3284.20 3284.30 0
2018-02-08 Multi-Stage Fracture 3243.10 3243.20 0
2018-02-08 Multi-Stage Fracture 3202.70 3202.80 0
2018-02-08 Multi-Stage Fracture 3162.60 3162.70 0
2018-02-08 Multi-Stage Fracture 3093.00 3093.10 0
2018-02-08 Multi-Stage Fracture 3051.50 3051.60 0
2018-02-08 Multi-Stage Fracture 3010.00 3010.10 0
2018-02-08 Multi-Stage Fracture 2968.40 2968.50 0
2018-02-08 Multi-Stage Fracture 2926.90 2970.00 0
2018-02-08 Multi-Stage Fracture 3629.70 3629.80 0
2018-02-08 Multi-Stage Fracture 2899.10 2899.20 0
2018-02-08 Multi-Stage Fracture 2858.30 2858.40 0
2018-02-08 Multi-Stage Fracture 2817.70 2817.80 0
2018-02-08 Multi-Stage Fracture 2775.30 2775.40 0
2018-02-08 Multi-Stage Fracture 2734.00 2734.10 0
2018-02-08 Multi-Stage Fracture 2693.20 2693.30 0
2018-02-08 Multi-Stage Fracture 2652.80 2652.90 0
2018-02-08 Multi-Stage Fracture 2624.30 2624.40 0
2018-02-08 Multi-Stage Fracture 2581.80 2581.90 0
2018-02-08 Multi-Stage Fracture 2539.10 2539.20 0
2018-02-08 Multi-Stage Fracture 3599.90 3600.00 0
2018-02-08 Multi-Stage Fracture 2496.90 2497.00 0
2018-02-08 Multi-Stage Fracture 2468.20 2468.30 0
2018-02-08 Multi-Stage Fracture 2426.10 2426.20 0
2018-02-09 Multi-Stage Fracture 2383.90 2384.00 0
2018-02-09 Multi-Stage Fracture 2341.30 2341.40 0
2018-02-09 Multi-Stage Fracture 2313.50 2313.60 0
2018-02-09 Multi-Stage Fracture 2272.00 2272.10 0
2018-02-09 Multi-Stage Fracture 2231.20 2231.30 0
2018-02-09 Multi-Stage Fracture 2189.80 2189.90 0
2018-02-09 Multi-Stage Fracture 2149.60 2149.70 0
2018-02-08 Multi-Stage Fracture 3554.90 3555.00 0
2018-02-09 Multi-Stage Fracture 2120.90 2121.00 0
2018-02-08 Multi-Stage Fracture 3519.70 3519.80 0
2018-02-08 Multi-Stage Fracture 3477.80 3477.90 0
2018-02-08 Multi-Stage Fracture 3436.30 3436.40 0
2018-02-08 Multi-Stage Fracture 3395.40 3395.50 0
2018-02-08 Multi-Stage Fracture 3367.30 3367.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-02-08 2018-02-09 1,828 6,622 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water 7732-18-5 100 95.8499 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 2.9168 N/A
40/70 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 1.3827 N/A
ELECIDE - 1L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0008 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0008 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0101 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0101 N/A
ELEFR-3A Element Friction Reducer Non-hazardous Ingredients Not Available 100 0.0911 N/A
Tergitol 15-S-20 68131-40-8 100 0.0911 N/A
ELEFE-3 Element Surfactant Isopropyl alcohol 67-63-0 100 0.094 N/A
Methanol 67-56-1 100 0.094 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.094 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2018-02-06 2018-02-07 Surface Water - Runoff 4091
2018-02-04 2018-02-05 Surface Water - Runoff 2567

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2018 7429 0.0 0.0 0.0
2019 8751 0.0 0.0 0.0
2020 2169 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-01-16 No Incident Encountered 0.00 0.00
2018-02-14 No Incident Encountered 0.00 0.00

For data sources see[10]

References