X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495093312000

Well Details

Well ID: 0495093312000
Loading map...
Location: 00/12-33-049-09W5/0
Location Alias: 00/12-33-49-09 W5M
Location Alias 2: 00/12-33-049-09 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 09
Section: 33
County/Municipality: Brazeau County
Well Name: PAN AM HB C-3 PEM IN 12-33-49-9
Operator Name: ARC Resources Ltd.
License Number: 0019069
License Date: 1960-05-20
License Status: RecCertified
Spud Date: 1960-07-28
Final Drill Date: 1960-08-05
Well Total Depth: 1617.00 m
Surface Hole Latitude: 53.274280
Surface Hole Longitude: -115.266090

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-05-20 Obtained License
1960-08-05 Finished Drilling
1960-08-05 Production Casing Operation Performed
1960-08-05 Well Mode changed to Drilled and Cased
1960-08-13 Perforation Treatment Performed - Jet Perforation
1960-08-17 Perforation Treatment Performed - Fractured
1960-09-28 Well Began Injection
1960-09-28 Well Fluid changed to Water
1960-09-28 Well Type changed to Injection
1962-08-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1992-01-01 Well Fluid changed to Water
1992-01-01 Well Mode changed to Suspended
1992-01-01 Well Type changed to Injection
1993-08-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-05 Perforation Treatment Performed - Jet Perforation
1993-08-05 Plug Back Performed
1993-08-06 Perforation Treatment Performed - Remedial Casing
1993-08-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-08-07 Well Fluid changed to Water
1993-08-07 Well Mode changed to Abandoned
1993-08-07 Well Type changed to Injection
1993-08-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-08-13 Perforation 1578.90 1580.40 13
1960-08-13 Perforation 1581.30 1584.40 13
1960-08-13 Perforation 1586.50 1587.70 13
1960-08-17 Fracture 1578.90 1587.70 0
1962-08-10 Acid Treatment 1578.90 1587.70 0
1993-08-05 Packing Device Capped w/Cement 1561.00 1569.00 0
1993-08-05 Perforation 473.00 473.50 13
1993-08-06 Remedial Casing Cementing 473.00 473.50 0
1993-08-07 Packing Device Capped w/Cement 273.00 480.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0

For data sources see[5]

References