X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495092410000

Well Details

Well ID: 0495092410000
Loading map...
Location: 00/10-24-049-09W5/0
Location Alias: 00/10-24-49-09 W5M
Location Alias 2: 00/10-24-049-09 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 09
Section: 24
County/Municipality: Brazeau County
Well Name: INPLAY OIL PEMBINA 10-24-49-9
Operator Name: InPlay Oil Corp.
License Number: 0015730
License Date: 1958-08-11
License Status: Abandoned
Spud Date: 1958-09-07
Final Drill Date: 1958-09-17
Well Total Depth: 1527.00 m
Surface Hole Latitude: 53.245550
Surface Hole Longitude: -115.180283

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-08-11 Obtained License
1958-09-17 Finished Drilling
1958-09-17 Production Casing Operation Performed
1958-09-17 Well Mode changed to Drilled and Cased
1958-09-19 Perforation Treatment Performed - Acid Wash - No Pressure
1958-09-19 Perforation Treatment Performed - Fractured
1958-09-19 Perforation Treatment Performed - Jet Perforation
1958-10-12 Well Began Production
1958-10-12 Well Fluid changed to Crude Oil
1958-10-12 Well Mode changed to Flowing
1958-11-23 Well Fluid changed to Crude Oil
1958-11-23 Well Mode changed to Pumping
1968-08-10 Perforation Treatment Performed - Fractured
1984-11-12 Well Log Performed
1998-09-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-09-30 Perforation Treatment Performed - Jet Perforation
1998-09-30 Plug Back Performed
1998-09-30 Well Log Performed
1998-10-01 Perforation Treatment Performed - Remedial Casing
1998-10-01 Well Abandoned
1998-10-01 Well Fluid changed to Crude Oil
1998-10-01 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-09-19 Perforation 1502.70 1503.90 13
1958-09-19 Perforation 1505.10 1506.90 13
1958-09-19 Acid Wash 1502.70 1506.90 0
1958-09-19 Fracture 1502.70 1506.90 0
1968-08-10 Fracture 1502.70 1506.90 0
1998-09-30 Packing Device Capped w/Cement 1484.00 1492.00 0
1998-09-30 Perforation 368.00 369.00 10
1998-10-01 Remedial Casing Cementing 368.00 369.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8640 0.0 0.0 0.0
1968 8280 0.0 0.0 0.0
1969 7919 0.0 0.0 0.0
1970 8071 0.0 0.0 0.0
1971 8039 0.0 0.0 0.0
1972 8515 0.0 0.0 0.0
1973 8519 0.0 0.0 0.0
1974 8735 0.0 0.0 0.0
1975 8711 0.0 0.0 0.0
1976 7872 0.0 0.0 0.0
1977 6864 0.0 0.0 0.0
1978 8759 0.0 0.0 0.0
1979 8585 0.0 0.0 0.0
1980 8111 0.0 0.0 0.0
1981 8711 0.0 0.0 0.0
1982 8384 0.0 0.0 0.0
1983 8639 0.0 0.0 0.0
1984 8267 0.0 0.0 0.0
1985 8159 0.0 0.0 0.0
1986 8351 0.0 0.0 0.0
1987 8555 0.0 0.0 0.0
1988 336 0.0 0.0 0.0

For data sources see[5]

References