X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495090212020

Well Details

Well ID: 0495090212020
Loading map...
Location: 02/12-02-049-09W5/0
Location Alias: 02/12-02-49-09 W5M
Location Alias 2: 02/12-02-049-09 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 09
Section: 02
County/Municipality: Brazeau County
Well Name: DAYLIGHT HZ 102 PEMBINA 12-2-49-9
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0434169
License Date: 2011-06-08
License Status: Issued
Spud Date: 2011-09-18
Final Drill Date: 2011-10-01
Well Total Depth: 3039.00 m
Surface Hole Latitude: 53.202480
Surface Hole Longitude: -115.199397

For data sources see[1][2]

Well History

Date Event
2011-06-08 Obtained License
2011-09-21 Surface Casing Operation Performed
2011-09-24 Direction Drilling Operation Performed - Horizontal
2011-09-26 Well Log Performed
2011-09-27 Intermediate Casing Operation Performed
2011-10-01 Finished Drilling
2011-10-01 Well Log Performed
2011-10-01 Well Mode changed to Drilled and Cased
2011-10-04 Liner Casing Operation Performed
2011-10-05 Rig Released
2011-10-08 Well Log Performed
2011-10-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-18 Perforation Treatment Performed - Open-Hole Completion
2011-10-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-10-24 Well Began Production
2011-10-24 Well Fluid changed to Crude Oil
2011-10-24 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-24 1815.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-10-18 Open Hole/Barefoot Completion 3034.00 3039.00 0
2011-10-18 Multi-Stage Fracture 3012.00 3012.10 0
2011-10-18 Multi-Stage Fracture 2887.00 2887.10 0
2011-10-18 Multi-Stage Fracture 2775.90 2776.00 0
2011-10-19 Multi-Stage Fracture 2689.80 2689.90 0
2011-10-19 Multi-Stage Fracture 2581.80 2581.90 0
2011-10-19 Multi-Stage Fracture 2451.10 2451.20 0
2011-10-19 Multi-Stage Fracture 2342.60 2342.70 0
2011-10-19 Multi-Stage Fracture 2233.40 2233.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 1280 0.0 0.0 0.0
2012 7589 0.0 0.0 0.0
2013 7759 0.0 0.0 0.0
2014 8622 0.0 0.0 0.0
2015 6534 0.0 0.0 0.0
2016 4964 0.0 0.0 0.0
2017 7666 0.0 0.0 0.0
2018 7026 0.0 0.0 0.0
2019 6872 0.0 0.0 0.0
2020 2135 0.0 0.0 0.0

For data sources see[6]

References