X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495083510000

Well Details

Well ID: 0495083510000
Loading map...
Location: 00/10-35-049-08W5/0
Location Alias: 00/10-35-49-08 W5M
Location Alias 2: 00/10-35-049-08 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 08
Section: 35
County/Municipality: Brazeau County
Well Name: ARC PEMBINA 10-35-49-8
Operator Name: ARC Resources Ltd.
License Number: 0015843
License Date: 1958-09-02
License Status: Issued
Spud Date: 1958-10-04
Final Drill Date: 1958-10-11
Well Total Depth: 1487.40 m
Surface Hole Latitude: 53.274210
Surface Hole Longitude: -115.059011

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-09-02 Obtained License
1958-10-11 Finished Drilling
1958-10-11 Production Casing Operation Performed
1958-10-11 Well Mode changed to Drilled and Cased
1958-10-15 Perforation Treatment Performed - Jet Perforation
1958-10-17 Perforation Treatment Performed - Acid Wash - No Pressure
1958-10-17 Perforation Treatment Performed - Fractured
1958-11-08 Well Began Production
1958-11-08 Well Fluid changed to Crude Oil
1958-11-08 Well Mode changed to Flowing
1963-07-12 Well Fluid changed to Crude Oil
1963-07-12 Well Mode changed to Pumping
1969-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1971-03-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1989-11-30 Well Fluid changed to Crude Oil
1989-11-30 Well Mode changed to Suspended
1992-04-08 Well Log Performed
1992-04-10 Perforation Treatment Performed - Jet Perforation
1992-04-14 Well Began Injection
1992-04-14 Well Fluid changed to Water
1992-04-14 Well Type changed to Injection
2003-08-25 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-10-15 Perforation 1457.60 1459.40 13
1958-10-15 Perforation 1460.00 1462.10 13
1958-10-15 Perforation 1463.30 1464.60 13
1958-10-15 Perforation 1465.20 1466.10 13
1958-10-17 Acid Wash 1457.60 1466.10 0
1958-10-17 Fracture 1457.60 1466.10 0
1969-10-22 Acid Treatment 1457.60 1466.10 0
1971-03-30 Acid Treatment 1457.60 1466.10 0
1992-04-10 Perforation 1457.50 1469.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 7090 0.0 0.0 0.0
1968 7009 0.0 0.0 0.0
1969 8349 0.0 0.0 0.0
1970 8494 0.0 0.0 0.0
1971 8474 0.0 0.0 0.0
1972 8413 0.0 0.0 0.0
1973 8691 0.0 0.0 0.0
1974 8182 0.0 0.0 0.0
1975 8524 0.0 0.0 0.0
1976 8645 0.0 0.0 0.0
1977 8696 0.0 0.0 0.0
1978 8755 0.0 0.0 0.0
1979 8755 0.0 0.0 0.0
1980 8759 0.0 0.0 0.0
1981 8719 0.0 0.0 0.0
1982 8388 0.0 0.0 0.0
1983 8332 0.0 0.0 0.0
1984 8435 0.0 0.0 0.0
1985 8343 0.0 0.0 0.0
1986 8208 0.0 0.0 0.0
1987 7406 0.0 0.0 0.0
1988 5928 0.0 0.0 0.0
1989 7454 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References