If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495081805000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.203566,"lon":-115.166698,"icon":""}]} |
Location: 00/05-18-049-08W5/0 | |
Location Alias: 00/05-18-49-08 W5M | |
Location Alias 2: 00/05-18-049-08 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 08 | |
Section: 18 | |
County/Municipality: Brazeau County | |
Well Name: ARC HZ PEMBINA 5-18-49-8 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0470598 | |
License Date: 2014-10-14 | |
License Status: Issued | |
Spud Date: 2015-01-12 | |
Final Drill Date: 2015-01-21 | |
Well Total Depth: 4062.00 m | |
Surface Hole Latitude: 53.203566 | |
Surface Hole Longitude: -115.166698 |
Date | Event |
---|---|
2014-10-14 | Obtained License |
2015-01-13 | Surface Casing Operation Performed |
2015-01-14 | Direction Drilling Operation Performed - Deviate |
2015-01-15 | Direction Drilling Operation Performed - Horizontal |
2015-01-17 | Intermediate Casing Operation Performed |
2015-01-21 | Finished Drilling |
2015-01-21 | Well Log Performed |
2015-01-21 | Well Mode changed to Drilled and Cased |
2015-01-22 | Liner Casing Operation Performed |
2015-01-22 | Perforation Treatment Performed - Open-Hole Completion |
2015-01-23 | Rig Released |
2015-11-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2015-12-08 | Well Began Production |
2015-12-08 | Well Fluid changed to Crude Oil |
2015-12-08 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2015-01-12 | Excalibur Drilling Ltd. | 9 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2015-01-14 | 1103.60 | Deviate (5 - 79 degrees) |
2015-01-15 | 1783.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2015-01-22 | Open Hole/Barefoot Completion | 4056.60 | 4062.00 | 0 |
2015-11-21 | Multi-Stage Fracture | 3406.70 | 3406.80 | 0 |
2015-11-21 | Multi-Stage Fracture | 3324.80 | 3324.90 | 0 |
2015-11-21 | Multi-Stage Fracture | 3242.10 | 3242.20 | 0 |
2015-11-21 | Multi-Stage Fracture | 3159.70 | 3159.80 | 0 |
2015-11-21 | Multi-Stage Fracture | 3076.80 | 3076.90 | 0 |
2015-11-21 | Multi-Stage Fracture | 2993.70 | 2993.80 | 0 |
2015-11-21 | Multi-Stage Fracture | 2924.50 | 2924.60 | 0 |
2015-11-21 | Multi-Stage Fracture | 2856.80 | 2856.90 | 0 |
2015-11-21 | Multi-Stage Fracture | 2760.00 | 2760.10 | 0 |
2015-11-21 | Multi-Stage Fracture | 2663.90 | 2664.00 | 0 |
2015-11-21 | Multi-Stage Fracture | 4027.80 | 4027.90 | 0 |
2015-11-21 | Multi-Stage Fracture | 2579.80 | 2579.90 | 0 |
2015-11-21 | Multi-Stage Fracture | 2495.60 | 2495.70 | 0 |
2015-11-21 | Multi-Stage Fracture | 2425.70 | 2425.80 | 0 |
2015-11-21 | Multi-Stage Fracture | 2342.90 | 2343.00 | 0 |
2015-11-21 | Multi-Stage Fracture | 2286.60 | 2286.70 | 0 |
2015-11-21 | Multi-Stage Fracture | 2203.10 | 2203.20 | 0 |
2015-11-21 | Multi-Stage Fracture | 2120.20 | 2120.30 | 0 |
2015-11-21 | Multi-Stage Fracture | 2036.60 | 2036.70 | 0 |
2015-11-21 | Multi-Stage Fracture | 1953.20 | 1953.30 | 0 |
2015-11-21 | Multi-Stage Fracture | 3957.80 | 3957.90 | 0 |
2015-11-21 | Multi-Stage Fracture | 3887.90 | 3888.00 | 0 |
2015-11-21 | Multi-Stage Fracture | 3804.80 | 3804.90 | 0 |
2015-11-21 | Multi-Stage Fracture | 3734.80 | 3734.90 | 0 |
2015-11-21 | Multi-Stage Fracture | 3678.70 | 3678.80 | 0 |
2015-11-21 | Multi-Stage Fracture | 3581.00 | 3581.10 | 0 |
2015-11-21 | Multi-Stage Fracture | 3486.70 | 3486.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-11-21 | 2015-11-21 | 1,555 | 3,851 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Not Available | 100 | 87.4335 | N/A | |||
20/40 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 9.1582 | N/A | ||
30/50 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 4.1931 | N/A | ||
50/140 Sand | Calfrac | Crystalline silica (Quartz) | 14808-60-7 | 100 | 0.6567 | N/A | ||
DWP-962 | Calfrac | Bactericide/Biocide | Phosphonium. tetrakis(hydroxymethyl)-. sulfate (2:1) (THPS) | 55566-30-8 | 100 | 0.0129 | N/A | |
Water | 7732-18-5 | 100 | 0.0135 | N/A | ||||
DWP-913 | Calfrac | Clay Control | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0806 | N/A | |
DWP-621 | Calfrac | Friction Reducer | Non-Hazardous Ingredients | Trade Secret | 100 | 0.0769 | N/A | |
DWP-967 | Calfrac | Surfactant | 2-Propanol | 67-63-0 | 100 | 0.0858 | N/A | |
Polyol | 9171 | 100 | 0.0879 | N/A | ||||
Quaternary Amine Compound | 9171 | 100 | 0.0871 | N/A | ||||
Surfactant 1 | 9171 | 100 | 0.0858 | N/A | ||||
Surfactant 2 | 9171 | 100 | 0.0879 | N/A | ||||
Terpenes and Terpenoids. sweet orange oil | 68647-72-3 | 100 | 0.0858 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2015-11-21 | 2015-11-22 | Surface Water - Runoff | 3850 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2015 | 515 | 0.0 | 0.0 | 0.0 |
2016 | 8127 | 0.0 | 0.0 | 0.0 |
2017 | 7989 | 0.0 | 0.0 | 0.0 |
2018 | 8292 | 0.0 | 0.0 | 0.0 |
2019 | 8460 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2015-01-23 | No Incident Encountered | 0.00 | 0.00 |
2015-11-27 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]