If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495073415000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.260516,"lon":-114.935994,"icon":""}]} |
Location: 00/15-34-049-07W5/0 | |
Location Alias: 00/15-34-49-07 W5M | |
Location Alias 2: 00/15-34-049-07 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 07 | |
Section: 34 | |
County/Municipality: Brazeau County | |
Well Name: ARC HZ PEMBINA 15-34-49-7 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0454138 | |
License Date: 2013-01-25 | |
License Status: Issued | |
Spud Date: 2013-02-21 | |
Final Drill Date: 2013-02-28 | |
Well Total Depth: 3003.00 m | |
Surface Hole Latitude: 53.260516 | |
Surface Hole Longitude: -114.935994 |
Date | Event |
---|---|
2013-01-25 | Obtained License |
2013-02-22 | Surface Casing Operation Performed |
2013-02-23 | Direction Drilling Operation Performed - Deviate |
2013-02-24 | Direction Drilling Operation Performed - Horizontal |
2013-02-26 | Intermediate Casing Operation Performed |
2013-02-28 | Finished Drilling |
2013-02-28 | Liner Casing Operation Performed |
2013-02-28 | Well Log Performed |
2013-02-28 | Well Mode changed to Drilled and Cased |
2013-03-01 | Perforation Treatment Performed - Open-Hole Completion |
2013-03-01 | Rig Released |
2013-03-06 | Well Log Performed |
2013-03-10 | Perforation Treatment Performed - Multi-Stage Fracture |
2013-03-12 | Well Began Production |
2013-03-12 | Well Fluid changed to Crude Oil |
2013-03-12 | Well Mode changed to Flowing |
2013-04-02 | Well Fluid changed to Crude Oil |
2013-04-02 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-02-21 | Excalibur Drilling Ltd. | 8 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-02-23 | 801.70 | Deviate (5 - 79 degrees) |
2013-02-24 | 1643.10 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-03-01 | Open Hole/Barefoot Completion | 2985.00 | 3003.00 | 0 |
2013-03-10 | Multi-Stage Fracture | 2483.00 | 2483.10 | 0 |
2013-03-10 | Multi-Stage Fracture | 2552.90 | 2553.00 | 0 |
2013-03-10 | Multi-Stage Fracture | 2622.60 | 2622.70 | 0 |
2013-03-10 | Multi-Stage Fracture | 2692.70 | 2692.80 | 0 |
2013-03-10 | Multi-Stage Fracture | 2775.60 | 2775.70 | 0 |
2013-03-10 | Multi-Stage Fracture | 2847.10 | 2847.20 | 0 |
2013-03-10 | Multi-Stage Fracture | 2918.50 | 2918.60 | 0 |
2013-03-10 | Multi-Stage Fracture | 2980.10 | 2980.20 | 0 |
2013-03-10 | Multi-Stage Fracture | 1933.70 | 1933.80 | 0 |
2013-03-10 | Multi-Stage Fracture | 1999.00 | 1999.10 | 0 |
2013-03-10 | Multi-Stage Fracture | 2066.70 | 2066.80 | 0 |
2013-03-10 | Multi-Stage Fracture | 2134.50 | 2134.60 | 0 |
2013-03-10 | Multi-Stage Fracture | 2204.80 | 2204.90 | 0 |
2013-03-10 | Multi-Stage Fracture | 2275.90 | 2276.00 | 0 |
2013-03-10 | Multi-Stage Fracture | 2346.70 | 2346.80 | 0 |
2013-03-10 | Multi-Stage Fracture | 2414.60 | 2414.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2013-03-10 | 2013-03-10 | 1,380 | 433 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | 7727-37-9 | 100 | 15.4891 | N/A | |||
Water | Not Available | 100 | 44.6245 | N/A | ||||
20/40 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 35.581 | N/A | ||
50/140 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 3.2978 | N/A | ||
B-1008 | Sanjel | Bactericide/Biocide | BNPD | 52-51-7 | 100 | 0.0041 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0041 | N/A | ||||
Breaker-1Z | Sanjel | Breaker | Cellulase enzyme | 9012-54-8 | 100 | 0.0466 | N/A | |
Ethylene Glycol | 107-21-1 | 100 | 0.0457 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0431 | N/A | ||||
Water | Not Available | 100 | 0.0422 | N/A | ||||
BUFFER-A | Sanjel | Buffer | Acetic Acid | 64-19-7 | 100 | 0.0865 | N/A | |
Water | Not Available | 100 | 0.0865 | N/A | ||||
SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.3792 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.3792 | N/A | ||||
FA-1 | Sanjel | Foamer | Ammonium C8-10 Alcohol | 68891-29-2 | 100 | 0.1803 | N/A | |
Ethanol | 64-17-5 | 100 | 0.1803 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.1803 | N/A | ||||
WG-6ZL | Sanjel | Gelling Agent | Polysaccharide Suspension | Not Available | 100 | 0.2674 | N/A | |
NE-5 | Sanjel | Surfactant | Alkyl benzenesulfonic acid | 68584-22-5 | 100 | 0.0474 | N/A | |
Diethylenetriamine | 111-40-0 | 100 | 0.0474 | N/A | ||||
Isopropyl Alcohol | 67-63-0 | 100 | 0.0474 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0474 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2013-03-05 | 2013-03-05 | Surface Water - River | 251 |
2013-03-06 | 2013-03-06 | Surface Water - River | 346 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2013 | 5587 | 0.0 | 0.0 | 0.0 |
2014 | 8491 | 0.0 | 0.0 | 0.0 |
2015 | 7263 | 0.0 | 0.0 | 0.0 |
2016 | 8220 | 0.0 | 0.0 | 0.0 |
2017 | 8377 | 0.0 | 0.0 | 0.0 |
2018 | 8446 | 0.0 | 0.0 | 0.0 |
2019 | 8525 | 0.0 | 0.0 | 0.0 |
2020 | 1881 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-03-01 | No Incident Encountered | 0.00 | 0.00 |
2013-03-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]