X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495073008000

Well Details

Well ID: 0495073008000
Loading map...
Location: 00/08-30-049-07W5/0
Location Alias: 00/08-30-49-07 W5M
Location Alias 2: 00/08-30-049-07 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 07
Section: 30
County/Municipality: Brazeau County
Well Name: ARC PEMBINA 8-30-49-7
Operator Name: ARC Resources Ltd.
License Number: 0022498
License Date: 1962-06-01
License Status: Suspension
Spud Date: 1962-06-02
Final Drill Date: 1962-06-08
Well Total Depth: 1453.90 m
Surface Hole Latitude: 53.256162
Surface Hole Longitude: -115.004329

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1962-06-01 Obtained License
1962-06-08 Finished Drilling
1962-06-08 Well Mode changed to Drilled and Cased
1962-06-09 Production Casing Operation Performed
1962-06-21 Perforation Treatment Performed - Acid Wash - No Pressure
1962-06-21 Perforation Treatment Performed - Fractured
1962-06-21 Perforation Treatment Performed - Jet Perforation
1962-07-02 Well Began Production
1962-07-02 Well Fluid changed to Crude Oil
1962-07-02 Well Mode changed to Flowing
1967-11-27 Well Fluid changed to Crude Oil
1967-11-27 Well Mode changed to Pumping
1976-06-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-09-08 Perforation Treatment Performed - Jet Perforation
1977-09-09 Perforation Treatment Performed - Fractured
1977-09-10 Perforation Treatment Performed - Fractured
1979-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-03-13 Perforation Treatment Performed - Fractured
1994-04-01 Well Fluid changed to Crude Oil
1994-04-01 Well Mode changed to Suspended
2011-08-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-08-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1962-06-21 Perforation 1431.00 1432.30 7
1977-09-08 Perforation 1433.80 1435.00 13
1977-09-08 Acid Treatment 1427.40 1435.00 0
1977-09-09 Fracture 1427.40 1435.00 0
1977-09-10 Fracture 1427.40 1435.00 0
1979-04-02 Acid Treatment 1427.40 1435.00 0
1985-03-13 Fracture 1427.40 1435.00 0
2011-08-09 Packing Device Capped w/Cement 1412.00 1420.00 0
1962-06-21 Acid Wash 1431.00 1432.30 0
1962-06-21 Fracture 1431.00 1432.30 0
1962-06-21 Perforation 1428.00 1430.10 7
1962-06-21 Acid Wash 1428.00 1432.30 0
1962-06-21 Fracture 1428.00 1432.30 0
1976-06-02 Acid Treatment 1428.00 1432.30 0
1977-09-08 Perforation 1427.40 1430.40 13
1977-09-08 Perforation 1431.60 1432.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5880 0.0 0.0 0.0
1968 8562 0.0 0.0 0.0
1969 8664 0.0 0.0 0.0
1970 8539 0.0 0.0 0.0
1971 8739 0.0 0.0 0.0
1972 8666 0.0 0.0 0.0
1973 8658 0.0 0.0 0.0
1974 8749 0.0 0.0 0.0
1975 8244 0.0 0.0 0.0
1976 8321 0.0 0.0 0.0
1977 8604 0.0 0.0 0.0
1978 8750 0.0 0.0 0.0
1979 8507 0.0 0.0 0.0
1980 8048 0.0 0.0 0.0
1981 8648 0.0 0.0 0.0
1982 8508 0.0 0.0 0.0
1983 8647 0.0 0.0 0.0
1984 8726 0.0 0.0 0.0
1985 7990 0.0 0.0 0.0
1986 8585 0.0 0.0 0.0
1987 6658 0.0 0.0 0.0
1988 6667 0.0 0.0 0.0
1989 7991 0.0 0.0 0.0
1990 8140 0.0 0.0 0.0
1991 6557 0.0 0.0 0.0
1993 236 0.0 0.0 0.0

For data sources see[5]

References