X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495071216020

Well Details

Well ID: 0495071216020
Loading map...
Location: 02/16-12-049-07W5/0
Location Alias: 02/16-12-49-07 W5M
Location Alias 2: 02/16-12-049-07 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 07
Section: 12
County/Municipality: Brazeau County
Well Name: BONTERRA 102 HZ PEMBINA 16-12-49-7
Operator Name: Bonterra Energy Corp.
License Number: 0492519
License Date: 2018-11-30
License Status: Issued
Spud Date: 2019-02-06
Final Drill Date: 2019-02-10
Well Total Depth: 2959.00 m
Surface Hole Latitude: 53.205713
Surface Hole Longitude: -114.884133

For data sources see[1][2]

Well History

Date Event
2018-11-30 Obtained License
2019-02-07 Surface Casing Operation Performed
2019-02-08 Direction Drilling Operation Performed - Deviate
2019-02-09 Direction Drilling Operation Performed - Horizontal
2019-02-10 Finished Drilling
2019-02-10 Well Mode changed to Drilled and Cased
2019-02-11 Well Log Performed
2019-02-12 Production Casing Operation Performed
2019-02-12 Rig Released
2019-02-17 Well Log Performed
2019-02-23 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-24 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-06 Well Began Production
2019-03-06 Well Fluid changed to Crude Oil
2019-03-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2019-02-06 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2019-02-08 1088.80 Deviate (5 - 79 degrees)
2019-02-09 1521.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-02-23 Multi-Stage Fracture 2910.70 2911.40 0
2019-02-24 Multi-Stage Fracture 2500.00 2500.70 0
2019-02-24 Multi-Stage Fracture 2454.50 2455.30 0
2019-02-24 Multi-Stage Fracture 2408.60 2409.30 0
2019-02-24 Multi-Stage Fracture 2362.80 2363.60 0
2019-02-24 Multi-Stage Fracture 2317.30 2318.10 0
2019-02-24 Multi-Stage Fracture 2271.80 2272.50 0
2019-02-24 Multi-Stage Fracture 2226.10 2226.80 0
2019-02-24 Multi-Stage Fracture 2090.00 2090.80 0
2019-02-24 Multi-Stage Fracture 2044.20 2044.90 0
2019-02-24 Multi-Stage Fracture 1998.50 1999.20 0
2019-02-23 Multi-Stage Fracture 2865.30 2866.00 0
2019-02-24 Multi-Stage Fracture 1952.50 1953.20 0
2019-02-24 Multi-Stage Fracture 1907.10 1907.80 0
2019-02-24 Multi-Stage Fracture 1861.30 1862.00 0
2019-02-24 Multi-Stage Fracture 1816.00 1816.70 0
2019-02-24 Multi-Stage Fracture 1770.60 1771.30 0
2019-02-24 Multi-Stage Fracture 1724.90 1725.60 0
2019-02-24 Multi-Stage Fracture 1679.20 1679.90 0
2019-02-24 Multi-Stage Fracture 1633.80 1634.60 0
2019-02-24 Multi-Stage Fracture 1588.40 1589.10 0
2019-02-24 Multi-Stage Fracture 1633.8 1634.6 0
2019-02-23 Multi-Stage Fracture 2819.70 2820.40 0
2019-02-24 Multi-Stage Fracture 1588.4 1589.1 0
2019-02-24 Multi-Stage Fracture 1542.5 1543.2 0
2019-02-23 Multi-Stage Fracture 2774.30 2775.00 0
2019-02-23 Multi-Stage Fracture 2728.90 2729.60 0
2019-02-23 Multi-Stage Fracture 2683.20 2684.00 0
2019-02-23 Multi-Stage Fracture 2637.10 2637.80 0
2019-02-24 Multi-Stage Fracture 2591.90 2592.20 0
2019-02-24 Multi-Stage Fracture 2545.80 2546.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-23 2019-02-24 1,381 2,905 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 84.0215 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 12.4255 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 3.9611 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0299 N/A
dibromoacetonitrile 3252-43-5 100 0.0299 N/A
non-hazardous ingredients Not Available 100 0.0299 N/A
polyethylene glycol 25322-68-3 100 0.0299 N/A
sodium bromide 7647-15-6 100 0.0299 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0789 N/A
water Not Available 100 0.0789 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0285 N/A
non-hazardous ingredients Not Available 100 0.0285 N/A
NMR-1N Trican Surfactant methanol 67-56-1 100 0.0395 N/A
non-hazardous ingredients Not Available 100 0.0395 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-02-23 2019-02-27 Surface Water - Runoff 3080

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7019 0.0 0.0 0.0
2020 2082 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-02-12 No Incident Encountered 0.00 0.00
2019-02-24 No Incident Encountered 0.00 0.00

For data sources see[10]

References