X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495071215000

Well Details

Well ID: 0495071215000
Loading map...
Location: 00/15-12-049-07W5/0
Location Alias: 00/15-12-49-07 W5M
Location Alias 2: 00/15-12-049-07 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 07
Section: 12
County/Municipality: Brazeau County
Well Name: BONTERRA HZ PEMBINA 15-12-49-7
Operator Name: Bonterra Energy Corp.
License Number: 0492518
License Date: 2018-11-30
License Status: Issued
Spud Date: 2019-01-24
Final Drill Date: 2019-01-28
Well Total Depth: 3024.00 m
Surface Hole Latitude: 53.205713
Surface Hole Longitude: -114.884507

For data sources see[1][2]

Well History

Date Event
2018-11-30 Obtained License
2019-01-25 Surface Casing Operation Performed
2019-01-26 Direction Drilling Operation Performed - Deviate
2019-01-27 Direction Drilling Operation Performed - Horizontal
2019-01-28 Finished Drilling
2019-01-28 Well Mode changed to Drilled and Cased
2019-01-29 Production Casing Operation Performed
2019-01-29 Well Log Performed
2019-01-30 Rig Released
2019-02-26 Perforation Treatment Performed - Multi-Stage Fracture
2019-02-27 Perforation Treatment Performed - Multi-Stage Fracture
2019-03-06 Well Began Production
2019-03-06 Well Fluid changed to Crude Oil
2019-03-06 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2019-01-26 1062.80 Deviate (5 - 79 degrees)
2019-01-27 1570.20 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-02-26 Multi-Stage Fracture 2996.50 2998.40 0
2019-02-27 Multi-Stage Fracture 2543.20 2545.10 0
2019-02-27 Multi-Stage Fracture 2493.60 2495.50 0
2019-02-27 Multi-Stage Fracture 2444.00 2445.90 0
2019-02-27 Multi-Stage Fracture 2295.10 2297.00 0
2019-02-27 Multi-Stage Fracture 2244.60 2246.50 0
2019-02-27 Multi-Stage Fracture 2196.80 2198.70 0
2019-02-27 Multi-Stage Fracture 2147.30 2149.20 0
2019-02-27 Multi-Stage Fracture 2098.10 2100.00 0
2019-02-27 Multi-Stage Fracture 2047.90 2049.80 0
2019-02-27 Multi-Stage Fracture 1998.00 2000.00 0
2019-02-26 Multi-Stage Fracture 2946.10 2948.00 0
2019-02-27 Multi-Stage Fracture 1948.00 1949.90 0
2019-02-27 Multi-Stage Fracture 1899.00 1900.90 0
2019-02-27 Multi-Stage Fracture 1849.60 1851.50 0
2019-02-27 Multi-Stage Fracture 1797.90 1799.80 0
2019-02-27 Multi-Stage Fracture 1745.50 1747.40 0
2019-02-27 Multi-Stage Fracture 1605.70 1607.60 0
2019-02-27 Multi-Stage Fracture 1745.5 1747.4 0
2019-02-27 Multi-Stage Fracture 1706.5 1708.4 0
2019-02-27 Multi-Stage Fracture 1656 1657.9 0
2019-02-27 Multi-Stage Fracture 1605.7 1607.6 0
2019-02-26 Multi-Stage Fracture 2895.50 2897.40 0
2019-02-27 Multi-Stage Fracture 2845.60 2847.50 0
2019-02-27 Multi-Stage Fracture 2795.10 2797.00 0
2019-02-27 Multi-Stage Fracture 2744.60 2746.50 0
2019-02-27 Multi-Stage Fracture 2694.60 2696.50 0
2019-02-27 Multi-Stage Fracture 2643.40 2645.30 0
2019-02-27 Multi-Stage Fracture 2594.20 2596.20 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-02-26 2019-02-27 1,383 2,403 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 82.1492 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 13.3363 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 4.3156 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0296 N/A
dibromoacetonitrile 3252-43-5 100 0.0296 N/A
non-hazardous ingredients Not Available 100 0.0296 N/A
polyethylene glycol 25322-68-3 100 0.0296 N/A
sodium bromide 7647-15-6 100 0.0296 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0839 N/A
water Not Available 100 0.0839 N/A
FR-22 Trican Friction Reducer distillates (petroleum). hydrotreated light naphthenic 64742-53-6 100 0.0454 N/A
non-hazardous ingredients Not Available 100 0.0454 N/A
NMR-1N Trican Surfactant methanol 67-56-1 100 0.0397 N/A
non-hazardous ingredients Not Available 100 0.0397 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-02-23 2019-02-27 Surface Water - Runoff 2403

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 7051 0.0 0.0 0.0
2020 2049 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-01-30 No Incident Encountered 0.00 0.00
2019-02-27 No Incident Encountered 0.00 0.00

For data sources see[9]

References