X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495063106000

Well Details

Well ID: 0495063106000
Loading map...
Location: 00/06-31-049-06W5/0
Location Alias: 00/06-31-49-06 W5M
Location Alias 2: 00/06-31-049-06 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 06
Section: 31
County/Municipality: Brazeau County
Well Name: MIC MAC ASHLAND PEMBINA 6-31-49-6
Operator Name: ARC Resources Ltd.
License Number: 0017150
License Date: 1959-05-26
License Status: RecCertified
Spud Date: 1959-06-14
Final Drill Date: 1959-06-21
Well Total Depth: 1267.40 m
Surface Hole Latitude: 53.270549
Surface Hole Longitude: -114.870065

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-05-26 Obtained License
1959-06-21 Finished Drilling
1959-06-21 Well Mode changed to Drilled and Cased
1959-06-22 Production Casing Operation Performed
1959-07-04 Perforation Treatment Performed - Acid Wash - No Pressure
1959-07-04 Perforation Treatment Performed - Fractured
1959-07-04 Perforation Treatment Performed - Jet Perforation
1959-07-10 Well Began Production
1959-07-10 Well Fluid changed to Crude Oil
1959-07-10 Well Mode changed to Flowing
1960-07-17 Well Fluid changed to Crude Oil
1960-07-17 Well Mode changed to Pumping
1971-11-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1972-07-18 Well Abandoned
1972-07-18 Well Fluid changed to Crude Oil
1972-07-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-07-04 Perforation 1245.10 1245.70 7
1959-07-04 Perforation 1246.60 1247.20 7
1959-07-04 Perforation 1249.10 1249.70 7
1959-07-04 Perforation 1250.60 1251.20 7
1959-07-04 Perforation 1252.10 1252.70 7
1959-07-04 Perforation 1253.90 1254.60 7
1959-07-04 Acid Wash 1245.10 1254.60 0
1959-07-04 Fracture 1245.10 1254.60 0
1971-11-14 Packing Device Capped w/Cement 1197.30 1267.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8627 0.0 0.0 0.0
1968 8655 0.0 0.0 0.0
1969 7583 0.0 0.0 0.0

For data sources see[5]

References