If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495063004030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.281679,"lon":-114.882799,"icon":""}]} |
Location: 03/04-30-049-06W5/0 | |
Location Alias: 03/04-30-49-06 W5M | |
Location Alias 2: 03/04-30-049-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 06 | |
Section: 30 | |
County/Municipality: Brazeau County | |
Well Name: ARC 103 HZ PEMBINA 4-30-49-6 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0461598 | |
License Date: 2013-11-28 | |
License Status: Suspension | |
Spud Date: 2014-02-13 | |
Final Drill Date: 2014-02-23 | |
Well Total Depth: 4354.00 m | |
Surface Hole Latitude: 53.281679 | |
Surface Hole Longitude: -114.882799 |
Date | Event |
---|---|
2013-11-28 | Obtained License |
2013-12-12 | Well Log Performed |
2014-02-13 | Surface Casing Operation Performed |
2014-02-14 | Direction Drilling Operation Performed - Deviate |
2014-02-15 | Direction Drilling Operation Performed - Horizontal |
2014-02-17 | Intermediate Casing Operation Performed |
2014-02-23 | Finished Drilling |
2014-02-23 | Well Log Performed |
2014-02-23 | Well Mode changed to Drilled and Cased |
2014-02-24 | Liner Casing Operation Performed |
2014-02-25 | Perforation Treatment Performed - Open-Hole Completion |
2014-02-25 | Rig Released |
2014-03-04 | Well Log Performed |
2014-03-08 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-03-08 | Perforation Treatment Performed - Open-Hole Completion |
2014-03-22 | Well Began Production |
2014-03-22 | Well Fluid changed to Crude Oil |
2014-03-22 | Well Mode changed to Pumping |
2019-02-01 | Well Fluid changed to Crude Oil |
2019-02-01 | Well Mode changed to Suspended |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-02-13 | Excalibur Drilling Ltd. | 9 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-02-14 | 920.00 | Deviate (5 - 79 degrees) |
2014-02-15 | 1456.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-02-25 | Open Hole/Barefoot Completion | 4326.00 | 4354.00 | 0 |
2014-03-08 | Multi-Stage Fracture | 3415.30 | 3415.40 | 0 |
2014-03-08 | Multi-Stage Fracture | 3297.40 | 3297.50 | 0 |
2014-03-08 | Multi-Stage Fracture | 3181.70 | 3181.80 | 0 |
2014-03-08 | Multi-Stage Fracture | 3065.30 | 3065.40 | 0 |
2014-03-08 | Multi-Stage Fracture | 2953.80 | 2953.90 | 0 |
2014-03-08 | Multi-Stage Fracture | 2838.10 | 2838.20 | 0 |
2014-03-08 | Multi-Stage Fracture | 2723.90 | 2724.00 | 0 |
2014-03-08 | Multi-Stage Fracture | 2607.50 | 2607.60 | 0 |
2014-03-08 | Multi-Stage Fracture | 2503.30 | 2503.40 | 0 |
2014-03-08 | Multi-Stage Fracture | 2399.60 | 2399.70 | 0 |
2014-03-08 | Multi-Stage Fracture | 4321.40 | 4321.50 | 0 |
2014-03-08 | Multi-Stage Fracture | 2293.50 | 2293.60 | 0 |
2014-03-08 | Multi-Stage Fracture | 2189.90 | 2190.00 | 0 |
2014-03-08 | Multi-Stage Fracture | 2087.90 | 2088.00 | 0 |
2014-03-08 | Multi-Stage Fracture | 1983.80 | 1983.90 | 0 |
2014-03-08 | Multi-Stage Fracture | 1878.10 | 1878.20 | 0 |
2014-03-08 | Multi-Stage Fracture | 1773.00 | 1773.10 | 0 |
2014-03-08 | Multi-Stage Fracture | 1667.20 | 1667.30 | 0 |
2014-03-08 | Open Hole/Barefoot Completion | 4326.00 | 4354.00 | 0 |
2014-03-08 | Multi-Stage Fracture | 4238.50 | 4238.60 | 0 |
2014-03-08 | Multi-Stage Fracture | 4122.90 | 4123.00 | 0 |
2014-03-08 | Multi-Stage Fracture | 4006.50 | 4006.60 | 0 |
2014-03-08 | Multi-Stage Fracture | 3887.60 | 3887.70 | 0 |
2014-03-08 | Multi-Stage Fracture | 3768.90 | 3769.00 | 0 |
2014-03-08 | Multi-Stage Fracture | 3650.90 | 3651.00 | 0 |
2014-03-08 | Multi-Stage Fracture | 3532.70 | 3532.80 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-03-08 | 2014-03-08 | 1,313 | 2,860 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | 7727-37-9 | 100 | 0.0971 | N/A | |||
Water | Not Available | 100 | 91.6015 | N/A | ||||
100 Mesh | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 0.8034 | N/A | ||
20/40 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 8.5431 | N/A | ||
30/50 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 5.8093 | N/A | ||
B-1008 | Sanjel | Bactericide/Biocide | BNPD | 52-51-7 | 100 | 0.0092 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.0092 | N/A | ||||
SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.185 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.185 | N/A | ||||
FRW-3 | Sanjel | Friction Reducer | Isoparaffinic Solvent | 64742-47-8 | 100 | 0.0467 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0467 | N/A | ||||
Surfactant | 68131-40-8 | 100 | 0.0467 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-03-03 | 2014-03-07 | Surface Water - Runoff | 158 |
2014-03-03 | 2014-03-10 | Surface Water - Runoff | 3179 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 5773 | 0.0 | 0.0 | 0.0 |
2015 | 8560 | 0.0 | 0.0 | 0.0 |
2016 | 8511 | 0.0 | 0.0 | 0.0 |
2017 | 8422 | 0.0 | 0.0 | 0.0 |
2018 | 3153 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-02-25 | No Incident Encountered | 0.00 | 0.00 |
2014-03-16 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]