If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495063004020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.253176,"lon":-114.85095,"icon":""}]} |
Location: 02/04-30-049-06W5/0 | |
Location Alias: 02/04-30-49-06 W5M | |
Location Alias 2: 02/04-30-049-06 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 06 | |
Section: 30 | |
County/Municipality: Brazeau County | |
Well Name: ARC HZ 102 PEMBINA 4-30-49-6 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0448717 | |
License Date: 2012-09-26 | |
License Status: Issued | |
Spud Date: 2012-10-28 | |
Final Drill Date: 2012-11-04 | |
Well Total Depth: 3066.00 m | |
Surface Hole Latitude: 53.253176 | |
Surface Hole Longitude: -114.850950 |
Date | Event |
---|---|
2012-09-26 | Obtained License |
2012-10-29 | Surface Casing Operation Performed |
2012-10-29 | Well Log Performed |
2012-10-30 | Direction Drilling Operation Performed - Deviate |
2012-10-31 | Direction Drilling Operation Performed - Horizontal |
2012-11-01 | Intermediate Casing Operation Performed |
2012-11-04 | Finished Drilling |
2012-11-04 | Well Log Performed |
2012-11-04 | Well Mode changed to Drilled and Cased |
2012-11-05 | Liner Casing Operation Performed |
2012-11-06 | Perforation Treatment Performed - Open-Hole Completion |
2012-11-06 | Rig Released |
2012-11-13 | Well Log Performed |
2012-11-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2012-11-22 | Well Began Production |
2012-11-22 | Well Fluid changed to Crude Oil |
2012-11-22 | Well Mode changed to Flowing |
2012-12-03 | Well Fluid changed to Crude Oil |
2012-12-03 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2012-10-29 | Excalibur Drilling Ltd. | EIGHT | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2012-10-30 | 1039.40 | Deviate (5 - 79 degrees) |
2012-10-31 | 1425.70 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-11-06 | Open Hole/Barefoot Completion | 3050.00 | 3066.00 | 0 |
2012-11-21 | Multi-Stage Fracture | 2249.00 | 2249.10 | 0 |
2012-11-21 | Multi-Stage Fracture | 2329.80 | 2329.90 | 0 |
2012-11-21 | Multi-Stage Fracture | 2411.80 | 2411.90 | 0 |
2012-11-21 | Multi-Stage Fracture | 2492.90 | 2493.00 | 0 |
2012-11-21 | Multi-Stage Fracture | 2573.40 | 2573.50 | 0 |
2012-11-21 | Multi-Stage Fracture | 2654.80 | 2654.90 | 0 |
2012-11-21 | Multi-Stage Fracture | 2736.80 | 2736.90 | 0 |
2012-11-21 | Multi-Stage Fracture | 2817.90 | 2818.00 | 0 |
2012-11-21 | Multi-Stage Fracture | 2899.70 | 2899.80 | 0 |
2012-11-21 | Multi-Stage Fracture | 2981.40 | 2981.50 | 0 |
2012-11-21 | Multi-Stage Fracture | 1523.50 | 1523.60 | 0 |
2012-11-21 | Multi-Stage Fracture | 3045.60 | 3045.70 | 0 |
2012-11-21 | Multi-Stage Fracture | 1615.40 | 1615.50 | 0 |
2012-11-21 | Multi-Stage Fracture | 1707.50 | 1707.60 | 0 |
2012-11-21 | Multi-Stage Fracture | 1799.30 | 1799.40 | 0 |
2012-11-21 | Multi-Stage Fracture | 1891.40 | 1891.50 | 0 |
2012-11-21 | Multi-Stage Fracture | 1983.50 | 1983.60 | 0 |
2012-11-21 | Multi-Stage Fracture | 2075.60 | 2075.70 | 0 |
2012-11-21 | Multi-Stage Fracture | 2163.40 | 2163.50 | 0 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 769 | 0.0 | 0.0 | 0.0 |
2013 | 8063 | 0.0 | 0.0 | 0.0 |
2014 | 7877 | 0.0 | 0.0 | 0.0 |
2015 | 7908 | 0.0 | 0.0 | 0.0 |
2016 | 8572 | 0.0 | 0.0 | 0.0 |
2017 | 8437 | 0.0 | 0.0 | 0.0 |
2018 | 7789 | 0.0 | 0.0 | 0.0 |
2019 | 7445 | 0.0 | 0.0 | 0.0 |
2020 | 1944 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-11-06 | No Incident Encountered | 0.00 | 0.00 |
2012-12-03 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]