X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495062708000

Well Details

Well ID: 0495062708000
Loading map...
Location: 00/08-27-049-06W5/0
Location Alias: 00/08-27-49-06 W5M
Location Alias 2: 00/08-27-049-06 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 06
Section: 27
County/Municipality: Brazeau County
Well Name: IMP CDN-SUP PEMBINA 8-27C-49-6
Operator Name: ARC Resources Ltd.
License Number: 0016174
License Date: 1958-11-05
License Status: Suspension
Spud Date: 1958-11-10
Final Drill Date: 1958-11-16
Well Total Depth: 1347.50 m
Surface Hole Latitude: 53.256069
Surface Hole Longitude: -114.784904

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-11-05 Obtained License
1958-11-16 Finished Drilling
1958-11-16 Well Mode changed to Drilled and Cased
1958-11-17 Drill Stem Test Performed
1958-11-18 Production Casing Operation Performed
1959-02-03 Perforation Treatment Performed - Jet Perforation
1959-02-04 Well Began Production
1959-02-04 Well Fluid changed to Crude Oil
1959-02-04 Well Mode changed to Flowing
1965-10-05 Well Fluid changed to Crude Oil
1965-10-05 Well Mode changed to Pumping
1979-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-21 Well Log Performed
1994-05-03 Perforation Treatment Performed - Jet Perforation
1994-05-03 Well Log Performed
1994-05-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-09-08 Well Log Performed
1998-09-09 Perforation Treatment Performed - Cement Squeeze
1998-09-11 Perforation Treatment Performed - Jet Perforation
1998-09-11 Well Log Performed
1998-09-14 Perforation Treatment Performed - Acid Squeeze - Press Used
2015-11-17 Well Fluid changed to Crude Oil
2015-11-17 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-02-03 Perforation 1312.50 1323.70 3
1979-06-27 Acid Treatment 1312.50 1323.70 0
1994-05-03 Perforation 1315.30 1319.10 13
1994-05-03 Perforation 1321.30 1322.50 13
1994-05-04 Acid Treatment 1315.30 1323.70 0
1998-09-09 Cement Squeeze 1312.50 1323.70 0
1998-09-11 Perforation 1316.50 1320.50 13
1998-09-11 Perforation 1322.00 1324.00 13
1998-09-14 Acid Treatment 1316.50 1324.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8591 0.0 0.0 0.0
1968 8615 0.0 0.0 0.0
1969 8640 0.0 0.0 0.0
1970 5392 0.0 0.0 0.0
1971 8650 0.0 0.0 0.0
1972 8759 0.0 0.0 0.0
1973 8226 0.0 0.0 0.0
1974 8295 0.0 0.0 0.0
1975 8637 0.0 0.0 0.0
1976 8301 0.0 0.0 0.0
1977 8694 0.0 0.0 0.0
1978 8364 0.0 0.0 0.0
1979 8027 0.0 0.0 0.0
1980 8335 0.0 0.0 0.0
1981 8268 0.0 0.0 0.0
1982 7877 0.0 0.0 0.0
1983 8311 0.0 0.0 0.0
1984 8610 0.0 0.0 0.0
1985 8081 0.0 0.0 0.0
1986 8567 0.0 0.0 0.0
1987 8295 0.0 0.0 0.0
1988 8336 0.0 0.0 0.0
1989 8487 0.0 0.0 0.0
1990 7796 0.0 0.0 0.0
1991 7628 0.0 0.0 0.0
1992 7719 0.0 0.0 0.0
1993 8255 0.0 0.0 0.0
1994 8045 0.0 0.0 0.0
1995 8543 0.0 0.0 0.0
1996 8133 0.0 0.0 0.0
1997 8672 0.0 0.0 0.0
1998 8261 0.0 0.0 0.0
1999 8346 0.0 0.0 0.0
2000 7751 0.0 0.0 0.0
2001 8562 0.0 0.0 0.0
2002 8654 0.0 0.0 0.0
2003 8623 0.0 0.0 0.0
2004 8284 0.0 0.0 0.0
2005 8610 0.0 0.0 0.0
2006 6542 0.0 0.0 0.0
2007 1760 0.0 0.0 0.0
2008 8193 0.0 0.0 0.0
2009 8478 0.0 0.0 0.0
2010 8657 0.0 0.0 0.0
2011 8624 0.0 0.0 0.0
2012 8779 0.0 0.0 0.0
2013 8667 0.0 0.0 0.0
2014 6226 0.0 0.0 0.0
2015 3329 0.0 0.0 0.0

For data sources see[5]

References