X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495060910000

Well Details

Well ID: 0495060910000
Loading map...
Location: 00/10-09-049-06W5/0
Location Alias: 00/10-09-49-06 W5M
Location Alias 2: 00/10-09-049-06 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 06
Section: 09
County/Municipality: Brazeau County
Well Name: SINOPEC PEMBINA 10-9-49-6
Operator Name: Sinopec Daylight Energy Ltd.
License Number: 0168785
License Date: 1994-07-19
License Status: Abandoned
Spud Date: 1994-08-13
Final Drill Date: 1994-08-25
Well Total Depth: 1947.00 m
Surface Hole Latitude: 53.215043
Surface Hole Longitude: -114.814796

For data sources see[1][2]

Well History

Date Event
1994-07-19 Obtained License
1994-08-15 Surface Casing Operation Performed
1994-08-25 Finished Drilling
1994-08-25 Well Mode changed to Drilled and Cased
1994-08-27 Well Log Performed
1994-08-28 Drill Stem Test Performed
1994-08-30 Production Casing Operation Performed
1994-08-30 Rig Released
1994-09-07 Perforation Treatment Performed - Jet Perforation
1994-09-07 Well Log Performed
1994-09-08 Well Log Performed
1994-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-09-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-09-10 Plug Back Performed
1994-09-10 Well Log Performed
1994-09-11 Well Log Performed
1994-09-12 Perforation Treatment Performed - Jet Perforation
1994-09-15 Perforation Treatment Performed - Fractured
1996-02-12 Well Began Production
1996-02-12 Well Fluid changed to Gas
1996-02-12 Well Mode changed to Flowing
1997-03-15 Well Log Performed
1997-11-01 Well Fluid changed to Gas
1997-11-01 Well Mode changed to Suspended
2009-01-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-01-30 Plug Back Performed
2009-01-30 Well Log Performed
2010-11-26 Well Log Performed
2010-11-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-27 Perforation Treatment Performed - Jet Perforation
2010-11-27 Plug Back Performed
2010-11-27 Well Fluid changed to Gas
2010-11-27 Well Log Performed
2010-11-27 Well Mode changed to Abandoned Zone
2010-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-28 Perforation Treatment Performed - Cement Squeeze
2010-11-29 Perforation Treatment Performed - Jet Perforation
2010-11-29 Well Log Performed
2010-11-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-11-30 Perforation Treatment Performed - Cement Squeeze
2010-12-01 Perforation Treatment Performed - Jet Perforation
2010-12-01 Well Log Performed
2010-12-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-07 Perforation Treatment Performed - Cement Squeeze
2010-12-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-12-09 Perforation Treatment Performed - Cement Squeeze
2010-12-09 Plug Back Performed
2011-05-18 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-09-07 Perforation 1900.00 1903.00 13
2009-01-30 Packing Device Capped w/Cement 1851.00 1859.00 0
2010-11-27 Packing Device Capped w/Cement 752.00 760.00 0
2010-11-27 Perforation 755.00 756.00 2
2010-11-28 Cement Squeeze 755.00 756.00 0
2010-11-28 Packing Device Capped w/Cement 742.00 751.00 0
2010-11-29 Perforation 664.00 665.00 17
2010-11-29 Perforation 610.00 611.00 17
2010-11-30 Cement Squeeze 664.00 665.00 0
2010-11-30 Packing Device Capped w/Cement 653.00 661.00 0
2010-12-01 Perforation 477.00 478.00 17
1994-09-07 Perforation 1903.80 1906.50 13
2010-12-07 Cement Squeeze 610.00 611.00 0
2010-12-07 Packing Device Capped w/Cement 598.00 606.00 0
2010-12-09 Packing Device Capped w/Cement 478.00 482.00 0
2010-12-09 Cement Squeeze 477.00 478.00 0
2010-12-09 Packing Device Capped w/Cement 466.00 474.00 0
1994-09-09 Acid Treatment 1900.00 1906.50 0
1994-09-10 Packing Device Capped w/Cement 1877.00 1885.00 0
1994-09-12 Perforation 1863.50 1864.50 14
1994-09-12 Perforation 1865.00 1868.50 14
1994-09-12 Perforation 1868.80 1870.50 14
1994-09-12 Perforation 1872.50 1875.00 14
1994-09-15 Fracture 1863.50 1875.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1996 2167 0.0 0.0 0.0
1997 24 0.0 0.0 0.0

For data sources see[5]

References