X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495060614000

Well Details

Well ID: 0495060614000
Loading map...
Location: 00/14-06-049-06W5/0
Location Alias: 00/14-06-49-06 W5M
Location Alias 2: 00/14-06-049-06 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 06
Section: 06
County/Municipality: Brazeau County
Well Name: ARC PEMBINA 14-6-49-6
Operator Name: ARC Resources Ltd.
License Number: 0015861
License Date: 1958-09-05
License Status: Suspension
Spud Date: 1958-09-28
Final Drill Date: 1958-10-06
Well Total Depth: 1405.10 m
Surface Hole Latitude: 53.205120
Surface Hole Longitude: -114.870051

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-09-05 Obtained License
1958-10-06 Finished Drilling
1958-10-06 Well Mode changed to Drilled and Cased
1958-10-07 Production Casing Operation Performed
1958-10-10 Perforation Treatment Performed - Jet Perforation
1958-10-13 Perforation Treatment Performed - Acid Wash - No Pressure
1958-10-13 Perforation Treatment Performed - Fractured
1958-10-23 Well Began Production
1958-10-23 Well Fluid changed to Crude Oil
1958-10-23 Well Mode changed to Flowing
1973-02-21 Well Fluid changed to Crude Oil
1973-02-21 Well Mode changed to Pumping
2000-06-21 Well Fluid changed to Crude Oil
2000-06-21 Well Mode changed to Suspended
2008-06-05 Well Log Performed
2008-06-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-06-10 Perforation Treatment Performed - Jet Perforation
2008-06-10 Plug Back Performed
2008-06-10 Well Fluid changed to Crude Oil
2008-06-10 Well Log Performed
2008-06-10 Well Mode changed to Abandoned Zone
2008-06-11 Perforation Treatment Performed - Remedial Casing
2008-06-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-06-12 Perforation Treatment Performed - Jet Perforation
2008-06-12 Well Log Performed
2008-06-13 Perforation Treatment Performed - Remedial Casing
2008-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-06-14 Perforation Treatment Performed - Jet Perforation
2008-06-14 Well Log Performed
2008-06-15 Perforation Treatment Performed - Remedial Casing
2008-06-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-10-10 Perforation 1389.30 1395.40 13
2008-06-13 Remedial Casing Cementing 339.00 340.00 0
2008-06-14 Packing Device Capped w/Cement 322.00 330.00 0
2008-06-14 Perforation 275.00 276.00 20
2008-06-15 Remedial Casing Cementing 275.00 276.00 0
2008-06-16 Packing Device Capped w/Cement 257.00 265.00 0
1958-10-10 Perforation 1393.50 1395.40 7
1958-10-13 Acid Wash 1389.30 1395.40 0
1958-10-13 Fracture 1389.30 1395.40 0
2008-06-10 Packing Device Capped w/Cement 1372.00 1380.00 0
2008-06-10 Perforation 746.70 747.70 20
2008-06-11 Remedial Casing Cementing 746.70 747.70 0
2008-06-12 Packing Device Capped w/Cement 730.00 738.00 0
2008-06-12 Perforation 339.00 340.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5830 0.0 0.0 0.0
1968 8287 0.0 0.0 0.0
1969 5330 0.0 0.0 0.0
1970 8046 0.0 0.0 0.0
1971 7859 0.0 0.0 0.0
1972 8127 0.0 0.0 0.0
1973 8240 0.0 0.0 0.0
1974 7228 0.0 0.0 0.0
1975 8171 0.0 0.0 0.0
1976 8380 0.0 0.0 0.0
1977 7560 0.0 0.0 0.0
1978 7535 0.0 0.0 0.0
1979 3360 0.0 0.0 0.0

For data sources see[5]

References