If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495053602000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.280182,"lon":-114.600768,"icon":""}]} |
Location: 00/02-36-049-05W5/0 | |
Location Alias: 00/02-36-49-05 W5M | |
Location Alias 2: 00/02-36-049-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 05 | |
Section: 36 | |
County/Municipality: Brazeau County | |
Well Name: BONTERRA HZ PEMBINA 2-36-49-5 | |
Operator Name: Bonterra Energy Corp. | |
License Number: 0462799 | |
License Date: 2013-12-20 | |
License Status: Issued | |
Spud Date: 2014-01-03 | |
Final Drill Date: 2014-01-11 | |
Well Total Depth: 2751.00 m | |
Surface Hole Latitude: 53.280182 | |
Surface Hole Longitude: -114.600768 |
Date | Event |
---|---|
2013-12-20 | Obtained License |
2014-01-06 | Surface Casing Operation Performed |
2014-01-07 | Direction Drilling Operation Performed - Deviate |
2014-01-09 | Direction Drilling Operation Performed - Horizontal |
2014-01-11 | Finished Drilling |
2014-01-11 | Well Mode changed to Drilled and Cased |
2014-01-13 | Production Casing Operation Performed |
2014-01-13 | Rig Released |
2014-01-17 | Well Log Performed |
2014-01-21 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-01-24 | Well Began Production |
2014-01-24 | Well Fluid changed to Crude Oil |
2014-01-24 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-01-05 | Trinidad Drilling Ltd. | 31 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-01-07 | 475.80 | Deviate (5 - 79 degrees) |
2014-01-09 | 1360.80 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-01-21 | Multi-Stage Fracture | 1409.90 | 1410.00 | 0 |
2014-01-21 | Multi-Stage Fracture | 2054.30 | 2054.40 | 0 |
2014-01-21 | Multi-Stage Fracture | 2125.80 | 2125.90 | 0 |
2014-01-21 | Multi-Stage Fracture | 2197.60 | 2197.70 | 0 |
2014-01-21 | Multi-Stage Fracture | 2282.60 | 2282.70 | 0 |
2014-01-21 | Multi-Stage Fracture | 2367.60 | 2367.70 | 0 |
2014-01-21 | Multi-Stage Fracture | 2452.60 | 2452.70 | 0 |
2014-01-21 | Multi-Stage Fracture | 2537.70 | 2537.80 | 0 |
2014-01-21 | Multi-Stage Fracture | 2622.70 | 2622.80 | 0 |
2014-01-21 | Multi-Stage Fracture | 2708.60 | 2708.70 | 0 |
2014-01-21 | Multi-Stage Fracture | 1481.60 | 1481.70 | 0 |
2014-01-21 | Multi-Stage Fracture | 1533.20 | 1533.30 | 0 |
2014-01-21 | Multi-Stage Fracture | 1624.80 | 1624.90 | 0 |
2014-01-21 | Multi-Stage Fracture | 1696.40 | 1696.50 | 0 |
2014-01-21 | Multi-Stage Fracture | 1767.90 | 1768.00 | 0 |
2014-01-21 | Multi-Stage Fracture | 1839.40 | 1839.50 | 0 |
2014-01-21 | Multi-Stage Fracture | 1911.10 | 1911.20 | 0 |
2014-01-21 | Multi-Stage Fracture | 1982.60 | 1982.70 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-01-21 | 2014-01-21 | 1,203 | 2,802 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 88.2305 | N/A | |||
Sand (30/50) | Trican | silica crystalline | 14808-60-7 | 100 | 7.3255 | N/A | ||
Sand (40/70) | Trican | silica crystalline | 14808-60-7 | 100 | 4.0744 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0115 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0115 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0115 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0115 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0115 | N/A | ||||
CC-7 | Trican | Clay Control | 1.6-hexanediamine. dihydrochloride | 6055-52-3 | 100 | 0.1936 | N/A | |
water | Not Available | 100 | 0.1936 | N/A | ||||
GNE-1 | Trican | Demulsifier | non-hazardous ingredients | Not Available | 100 | 0.05 | N/A | |
propylene glycol | 57-55-6 | 100 | 0.05 | N/A | ||||
GFR-1 | Trican | Friction Reducer | non-hazardous ingredients | Not Available | 100 | 0.114 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-01-15 | 2014-02-15 | Surface Water - Lake | 2802 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 7970 | 0.0 | 0.0 | 0.0 |
2015 | 8563 | 0.0 | 0.0 | 0.0 |
2016 | 8004 | 0.0 | 0.0 | 0.0 |
2017 | 8447 | 0.0 | 0.0 | 0.0 |
2018 | 8372 | 0.0 | 0.0 | 0.0 |
2019 | 8370 | 0.0 | 0.0 | 0.0 |
2020 | 2130 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-01-13 | No Incident Encountered | 0.00 | 0.00 |
2014-01-21 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]