X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495052410000

Well Details

Well ID: 0495052410000
Loading map...
Location: 00/10-24-049-05W5/0
Location Alias: 00/10-24-49-05 W5M
Location Alias 2: 00/10-24-049-05 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 05
Section: 24
County/Municipality: Brazeau County
Well Name: BONTERRA HZ PEMBINA 10-24-49-5
Operator Name: Bonterra Energy Corp.
License Number: 0472745
License Date: 2014-12-08
License Status: Issued
Spud Date: 2015-01-02
Final Drill Date: 2015-01-08
Well Total Depth: 3007.00 m
Surface Hole Latitude: 53.246523
Surface Hole Longitude: -114.570648

For data sources see[1][2]

Well History

Date Event
2014-12-08 Obtained License
2015-01-04 Surface Casing Operation Performed
2015-01-05 Direction Drilling Operation Performed - Deviate
2015-01-06 Direction Drilling Operation Performed - Horizontal
2015-01-06 Well Log Performed
2015-01-08 Finished Drilling
2015-01-08 Well Mode changed to Drilled and Cased
2015-01-09 Production Casing Operation Performed
2015-01-09 Well Log Performed
2015-01-10 Rig Released
2015-02-09 Well Log Performed
2015-02-17 Perforation Treatment Performed - Multi-Stage Fracture
2015-02-19 Well Log Performed
2015-04-01 Well Began Production
2015-04-01 Well Fluid changed to Crude Oil
2015-04-01 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2015-01-02 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2015-01-05 924.40 Deviate (5 - 79 degrees)
2015-01-06 1484.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2015-02-17 Multi-Stage Fracture 2935.10 2935.90 0
2015-02-17 Multi-Stage Fracture 2408.10 2409.90 0
2015-02-17 Multi-Stage Fracture 2357.10 2359.00 0
2015-02-17 Multi-Stage Fracture 2294.60 2296.40 0
2015-02-17 Multi-Stage Fracture 2231.90 2233.80 0
2015-02-17 Multi-Stage Fracture 2181.00 2182.90 0
2015-02-17 Multi-Stage Fracture 2118.50 2120.40 0
2015-02-17 Multi-Stage Fracture 2056.30 2058.20 0
2015-02-17 Multi-Stage Fracture 2005.30 2007.20 0
2015-02-17 Multi-Stage Fracture 1942.90 1944.70 0
2015-02-17 Multi-Stage Fracture 1880.20 1882.10 0
2015-02-17 Multi-Stage Fracture 2885.40 2887.30 0
2015-02-17 Multi-Stage Fracture 1829.20 1831.10 0
2015-02-17 Multi-Stage Fracture 1766.60 1768.40 0
2015-02-17 Multi-Stage Fracture 1703.90 1705.80 0
2015-02-17 Multi-Stage Fracture 1653.00 1654.90 0
2015-02-17 Multi-Stage Fracture 1590.40 1592.30 0
2015-02-17 Multi-Stage Fracture 1539.50 1541.40 0
2015-02-17 Multi-Stage Fracture 2822.80 2824.60 0
2015-02-17 Multi-Stage Fracture 2760.10 2762.00 0
2015-02-17 Multi-Stage Fracture 2709.20 2711.10 0
2015-02-17 Multi-Stage Fracture 2646.80 2648.60 0
2015-02-17 Multi-Stage Fracture 2584.20 2586.10 0
2015-02-17 Multi-Stage Fracture 2533.30 2535.20 0
2015-02-17 Multi-Stage Fracture 2470.70 2472.60 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-02-17 2015-02-17 1,258 2,017 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 83.4258 N/A
Sand 20/40 Trican silica crystalline 14808-60-7 100 11.2722 N/A
Sand 30/50 Trican silica crystalline 14808-60-7 100 4.9565 N/A
Sand 40/70 Trican silica crystalline 14808-60-7 100 0.4246 N/A
Busan 94 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0108 N/A
dibromoacetonitrile 3252-43-5 100 0.0108 N/A
non-hazardous ingredients Not Available 100 0.0108 N/A
polyethylene glycol 25322-68-3 100 0.0108 N/A
sodium bromide 7647-15-6 100 0.0108 N/A
CC-8 Trican Clay Control choline chloride 67-48-1 100 0.1835 N/A
non-hazardous ingredients Not Available 100 0.1835 N/A
GNE-1 Trican Demulsifier non-hazardous ingredients Not Available 100 0.0468 N/A
propylene glycol 57-55-6 100 0.0468 N/A
FR-12 Trican Friction Reducer ammonium chloride 12125-02-9 100 0.0871 N/A
anionic polyacrylamide copolymer 25987-30-8 100 0.0871 N/A
distillates (petroleum). hydrotreated light 64742-47-8 100 0.0871 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2015-02-17 2015-02-17 Surface Water - Lake 2089

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2015 6114 0.0 0.0 0.0
2016 8522 0.0 0.0 0.0
2017 8326 0.0 0.0 0.0
2018 8384 0.0 0.0 0.0
2019 8408 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-01-10 No Incident Encountered 0.00 0.00
2015-02-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References