If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495051916020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.256112,"lon":-114.7369,"icon":""}]} |
Location: 02/16-19-049-05W5/0 | |
Location Alias: 02/16-19-49-05 W5M | |
Location Alias 2: 02/16-19-049-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 05 | |
Section: 19 | |
County/Municipality: Brazeau County | |
Well Name: ARC 102 HZ PEMBINA 16-19-49-5 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0466557 | |
License Date: 2014-05-09 | |
License Status: Issued | |
Spud Date: 2014-06-23 | |
Final Drill Date: 2014-06-30 | |
Well Total Depth: 2941.00 m | |
Surface Hole Latitude: 53.256112 | |
Surface Hole Longitude: -114.736900 |
Date | Event |
---|---|
2014-05-09 | Obtained License |
2014-06-24 | Surface Casing Operation Performed |
2014-06-25 | Direction Drilling Operation Performed - Deviate |
2014-06-26 | Direction Drilling Operation Performed - Horizontal |
2014-06-27 | Intermediate Casing Operation Performed |
2014-06-30 | Finished Drilling |
2014-06-30 | Well Log Performed |
2014-06-30 | Well Mode changed to Drilled and Cased |
2014-07-01 | Liner Casing Operation Performed |
2014-07-01 | Perforation Treatment Performed - Open-Hole Completion |
2014-07-01 | Rig Released |
2014-08-01 | Well Log Performed |
2014-08-26 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-10-08 | Well Began Production |
2014-10-08 | Well Fluid changed to Crude Oil |
2014-10-08 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2014-06-24 | Excalibur Drilling Ltd. | 8 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2014-06-25 | 953.70 | Deviate (5 - 79 degrees) |
2014-06-26 | 1398.90 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2014-07-01 | Open Hole/Barefoot Completion | 2922.00 | 2941.00 | 0 |
2014-08-26 | Multi-Stage Fracture | 2302.90 | 2303.00 | 0 |
2014-08-26 | Multi-Stage Fracture | 2223.30 | 2223.40 | 0 |
2014-08-26 | Multi-Stage Fracture | 2144.10 | 2144.20 | 0 |
2014-08-26 | Multi-Stage Fracture | 2063.80 | 2063.90 | 0 |
2014-08-26 | Multi-Stage Fracture | 1985.30 | 1985.40 | 0 |
2014-08-26 | Multi-Stage Fracture | 1906.40 | 1906.50 | 0 |
2014-08-26 | Multi-Stage Fracture | 1830.00 | 1830.10 | 0 |
2014-08-26 | Multi-Stage Fracture | 1751.40 | 1751.50 | 0 |
2014-08-26 | Multi-Stage Fracture | 1675.80 | 1675.90 | 0 |
2014-08-26 | Multi-Stage Fracture | 1609.60 | 1609.70 | 0 |
2014-08-26 | Multi-Stage Fracture | 2917.40 | 2917.50 | 0 |
2014-08-26 | Multi-Stage Fracture | 1546.10 | 1546.20 | 0 |
2014-08-26 | Multi-Stage Fracture | 1479.80 | 1479.90 | 0 |
2014-08-26 | Multi-Stage Fracture | 2846.70 | 2846.80 | 0 |
2014-08-26 | Multi-Stage Fracture | 2768.00 | 2768.10 | 0 |
2014-08-26 | Multi-Stage Fracture | 2691.70 | 2691.80 | 0 |
2014-08-26 | Multi-Stage Fracture | 2611.60 | 2611.70 | 0 |
2014-08-26 | Multi-Stage Fracture | 2535.20 | 2535.30 | 0 |
2014-08-26 | Multi-Stage Fracture | 2455.30 | 2455.40 | 0 |
2014-08-26 | Multi-Stage Fracture | 2378.90 | 2379.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-08-26 | 2014-08-26 | 1,263 | 2,642 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | water | Not Available | 100 | 81.0213 | N/A | |||
Sand 20/40 | Trican | silica crystalline | 14808-60-7 | 100 | 18.467 | N/A | ||
Sand 30/50 | Trican | silica crystalline | 14808-60-7 | 100 | 16.2429 | N/A | ||
Sand 50/140 | Trican | silica crystalline | 14808-60-7 | 100 | 0.836 | N/A | ||
Busan 94 | Trican | Bactericide/Biocide | 2.2-dibromo-3-nitrilopropionamide | 10222-01-2 | 100 | 0.0101 | N/A | |
dibromoacetonitrile | 3252-43-5 | 100 | 0.0101 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0101 | N/A | ||||
polyethylene glycol | 25322-68-3 | 100 | 0.0101 | N/A | ||||
sodium bromide | 7647-15-6 | 100 | 0.0101 | N/A | ||||
CC-77 | Trican | Clay Control | 1.3-propanediaminium-2-substitued. -hexaalkyl-. di halide | 7744 | 100 | 0.178 | N/A | |
non-hazardous ingredients | Not Available | 100 | 0.178 | N/A | ||||
FR-8 | Trican | Friction Reducer | ammonium chloride | 12125-02-9 | 100 | 0.0433 | N/A | |
distillates (petroleum). hydrotreated light | 64742-47-8 | 100 | 0.0433 | N/A | ||||
non-hazardous ingredients | Not Available | 100 | 0.0433 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-07-25 | 2014-09-25 | Surface Water - Lake | 2644 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 1826 | 0.0 | 0.0 | 0.0 |
2015 | 7341 | 0.0 | 0.0 | 0.0 |
2016 | 8643 | 0.0 | 0.0 | 0.0 |
2017 | 6460 | 0.0 | 0.0 | 0.0 |
2018 | 5948 | 0.0 | 0.0 | 0.0 |
2019 | 7588 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2014-07-01 | No Incident Encountered | 0.00 | 0.00 |
2014-08-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]