X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495051806000

Well Details

Well ID: 0495051806000
Loading map...
Location: 00/06-18-049-05W5/0
Location Alias: 00/06-18-49-05 W5M
Location Alias 2: 00/06-18-049-05 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 05
Section: 18
County/Municipality: Brazeau County
Well Name: CREE DEKALB PEMBINA 6-18-49-5
Operator Name: ARC Resources Ltd.
License Number: 0017707
License Date: 1959-09-09
License Status: Issued
Spud Date: 1959-10-03
Final Drill Date: 1959-10-10
Well Total Depth: 1287.80 m
Surface Hole Latitude: 53.227001
Surface Hole Longitude: -114.723839

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-09-09 Obtained License
1959-10-10 Finished Drilling
1959-10-10 Well Mode changed to Drilled and Cased
1959-10-11 Production Casing Operation Performed
1959-11-08 Perforation Treatment Performed - Jet Perforation
1959-11-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-11-16 Perforation Treatment Performed - Fractured
1959-11-19 Well Began Production
1959-11-19 Well Fluid changed to Crude Oil
1959-11-19 Well Mode changed to Flowing
1963-08-22 Well Fluid changed to Crude Oil
1963-08-22 Well Mode changed to Pumping
1975-06-20 Well Fluid changed to Crude Oil
1975-06-20 Well Mode changed to Flowing
1977-10-28 Well Fluid changed to Crude Oil
1977-10-28 Well Mode changed to Pumping
1986-11-17 Perforation Treatment Performed - Jet Perforation
1986-11-17 Well Log Performed
1986-11-19 Perforation Treatment Performed - Fractured
1992-01-17 Well Log Performed
1992-01-20 Well Log Performed
1992-02-01 Well Began Injection
1992-02-01 Well Fluid changed to Water
1992-02-01 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-11-08 Perforation 1259.70 1263.40 3
1959-11-08 Perforation 1263.40 1268.30 7
1959-11-16 Acid Treatment 1259.70 1268.30 0
1959-11-16 Fracture 1259.70 1268.30 0
1986-11-17 Perforation 1259.40 1268.50 13
1986-11-19 Fracture 1259.40 1268.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 696 0.0 0.0 0.0
1977 1528 0.0 0.0 0.0
1978 8412 0.0 0.0 0.0
1979 6714 0.0 0.0 0.0
1980 7807 0.0 0.0 0.0
1981 8016 0.0 0.0 0.0
1982 7383 0.0 0.0 0.0
1983 7454 0.0 0.0 0.0
1984 7543 0.0 0.0 0.0
1985 7266 0.0 0.0 0.0
1986 7827 0.0 0.0 0.0
1987 8405 0.0 0.0 0.0
1988 8324 0.0 0.0 0.0
1989 7961 0.0 0.0 0.0
1990 7874 0.0 0.0 0.0
1991 7723 0.0 0.0 0.0
1992 312 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References