X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495050701000

Well Details

Well ID: 0495050701000
Loading map...
Location: 00/01-07-049-05W5/0
Location Alias: 00/01-07-49-05 W5M
Location Alias 2: 00/01-07-049-05 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 05
Section: 07
County/Municipality: Brazeau County
Well Name: ARC HZ PEMBINA 1-7-49-5
Operator Name: ARC Resources Ltd.
License Number: 0421358
License Date: 2010-06-23
License Status: Amended
Spud Date: 2010-07-12
Final Drill Date: 2010-07-22
Well Total Depth: 3004.90 m
Surface Hole Latitude: 53.209094
Surface Hole Longitude: -114.741985

For data sources see[1][2]

Well History

Date Event
2010-06-23 Obtained License
2010-07-13 Surface Casing Operation Performed
2010-07-16 Direction Drilling Operation Performed - Horizontal
2010-07-18 Intermediate Casing Operation Performed
2010-07-22 Finished Drilling
2010-07-22 Well Log Performed
2010-07-22 Well Mode changed to Drilled and Cased
2010-07-23 Well Log Performed
2010-07-24 Liner Casing Operation Performed
2010-07-25 Rig Released
2010-08-16 Perforation Treatment Performed - Open-Hole Completion
2010-08-16 Well Log Performed
2010-08-20 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-03 Well Began Production
2010-11-03 Well Fluid changed to Crude Oil
2010-11-03 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-07-16 1020.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-08-16 Open Hole/Barefoot Completion 1469.00 2902.00 0
2010-08-20 Multi-Stage Fracture 2354.00 2464.00 0
2010-08-20 Multi-Stage Fracture 2465.00 2573.00 0
2010-08-20 Multi-Stage Fracture 2574.00 2693.00 0
2010-08-20 Multi-Stage Fracture 2694.00 2802.00 0
2010-08-20 Multi-Stage Fracture 2803.00 2902.00 0
2010-08-20 Multi-Stage Fracture 1469.00 1579.00 0
2010-08-20 Multi-Stage Fracture 1580.00 1689.00 0
2010-08-20 Multi-Stage Fracture 1690.00 1799.00 0
2010-08-20 Multi-Stage Fracture 1800.00 1911.00 0
2010-08-20 Multi-Stage Fracture 1912.00 2022.00 0
2010-08-20 Multi-Stage Fracture 2023.00 2132.00 0
2010-08-20 Multi-Stage Fracture 2133.00 2243.00 0
2010-08-20 Multi-Stage Fracture 2244.00 2353.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 1332 0.0 0.0 0.0
2011 8245 0.0 0.0 0.0
2012 8448 0.0 0.0 0.0
2013 8232 0.0 0.0 0.0
2014 8213 0.0 0.0 0.0
2015 7754 0.0 0.0 0.0
2016 8268 0.0 0.0 0.0
2017 7654 0.0 0.0 0.0
2018 7919 0.0 0.0 0.0
2019 8362 0.0 0.0 0.0
2020 48 0.0 0.0 0.0

For data sources see[6]

References