X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495043604000

Well Details

Well ID: 0495043604000
Loading map...
Location: 00/04-36-049-04W5/0
Location Alias: 00/04-36-49-04 W5M
Location Alias 2: 00/04-36-049-04 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 04
Section: 36
County/Municipality: Leduc County
Well Name: JOURNEY PEMBINA 4-36-49-4
Operator Name: Journey Energy Inc.
License Number: 0091405
License Date: 1981-07-23
License Status: Suspension
Spud Date: 1981-08-07
Final Drill Date: 1981-08-13
Well Total Depth: 1724.00 m
Surface Hole Latitude: 53.268624
Surface Hole Longitude: -114.461158

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-07-23 Obtained License
1981-08-13 Finished Drilling
1981-08-13 Well Mode changed to Drilled and Cased
1981-08-15 Drill Stem Test Performed
1981-08-17 Production Casing Operation Performed
1981-08-22 Perforation Treatment Performed - Jet Perforation
1981-08-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-08-26 Perforation Treatment Performed - Jet Perforation
1981-08-27 Perforation Treatment Performed - Cement Squeeze
1981-08-30 Perforation Treatment Performed - Jet Perforation
1981-10-02 Well Began Production
1981-10-02 Well Fluid changed to Crude Oil
1981-10-02 Well Mode changed to Pumping
1988-07-07 Well Log Performed
1988-07-08 Perforation Treatment Performed - Jet Perforation
1988-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-07-09 Perforation Treatment Performed - Jet Perforation
1996-10-31 Well Fluid changed to Crude Oil
1996-10-31 Well Mode changed to Suspended
2000-06-01 Well Fluid changed to Crude Oil
2000-06-01 Well Mode changed to Pumping
2000-08-01 Well Fluid changed to Crude Oil
2000-08-01 Well Mode changed to Suspended
2012-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-11-04 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2012-11-04 Plug Back Performed
2012-11-04 Well Fluid changed to Crude Oil
2012-11-04 Well Log Performed
2012-11-04 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-08-22 Perforation 1638.50 1641.50 13
2012-11-04 Packing Device Capped w/Cement 1608.00 1616.00 0
1981-08-25 Packing Device Capped w/Cement 1630.00 1635.00 0
1981-08-26 Perforation 1624.00 1625.50 14
1981-08-27 Cement Squeeze 1624.00 1625.50 0
1981-08-30 Perforation 1629.50 1631.00 14
1988-07-08 Perforation 1638.50 1641.50 13
1988-07-09 Perforation 1629.50 1633.00 13
1988-07-09 Acid Treatment 1629.50 1633.00 0
2012-11-04 Packing Dev Cpd w/Res-Gyp Cem 1626.00 1629.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1548 0.0 0.0 0.0
1982 4982 0.0 0.0 0.0
1983 6017 0.0 0.0 0.0
1984 6678 0.0 0.0 0.0
1985 6832 0.0 0.0 0.0
1986 139 0.0 0.0 0.0
1987 1872 0.0 0.0 0.0
1988 4085 0.0 0.0 0.0
1989 8136 0.0 0.0 0.0
1990 8216 0.0 0.0 0.0
1991 8230 0.0 0.0 0.0
1992 8703 0.0 0.0 0.0
1993 8348 0.0 0.0 0.0
1994 8277 0.0 0.0 0.0
1995 8401 0.0 0.0 0.0
1996 5324 0.0 0.0 0.0
2000 1386 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-11-05 No Incident Encountered 0.00 0.00

For data sources see[6]

References