X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495042104000

Well Details

Well ID: 0495042104000
Loading map...
Location: 00/04-21-049-04W5/0
Location Alias: 00/04-21-49-04 W5M
Location Alias 2: 00/04-21-049-04 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 04
Section: 21
County/Municipality: Leduc County
Well Name: WHITECAP PEMBINA 4-21-49-4
Operator Name: Whitecap Resources Inc.
License Number: 0424171
License Date: 2010-10-01
License Status: Amended
Spud Date: 2010-10-28
Final Drill Date: 2010-11-12
Well Total Depth: 2722.00 m
Surface Hole Latitude: 53.239647
Surface Hole Longitude: -114.514729

For data sources see[1][2]

Well History

Date Event
2010-10-01 Obtained License
2010-11-01 Surface Casing Operation Performed
2010-11-02 Direction Drilling Operation Performed - Horizontal
2010-11-04 Intermediate Casing Operation Performed
2010-11-12 Finished Drilling
2010-11-12 Liner Casing Operation Performed
2010-11-12 Well Mode changed to Drilled and Cased
2010-11-15 Rig Released
2010-11-18 Well Log Performed
2010-11-21 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-22 Perforation Treatment Performed - Multi-Stage Fracture
2010-11-22 Perforation Treatment Performed - Open-Hole Completion
2010-12-23 Well Began Production
2010-12-23 Well Fluid changed to Crude Oil
2010-12-23 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-02 1003.26 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-11-21 Multi-Stage Fracture 2666.20 2668.30 0
2010-11-21 Multi-Stage Fracture 1907.60 1908.80 0
2010-11-21 Multi-Stage Fracture 1817.80 1819.00 0
2010-11-22 Multi-Stage Fracture 1740.30 1741.50 0
2010-11-22 Multi-Stage Fracture 1663.70 1664.90 0
2010-11-22 Multi-Stage Fracture 1571.10 1572.30 0
2010-11-22 Multi-Stage Fracture 1493.40 1494.60 0
2010-11-22 Open Hole/Barefoot Completion 2705.00 2722.00 0
2010-11-21 Multi-Stage Fracture 2587.00 2588.30 0
2010-11-21 Multi-Stage Fracture 2509.20 2510.50 0
2010-11-21 Multi-Stage Fracture 2416.50 2417.70 0
2010-11-21 Multi-Stage Fracture 2326.00 2327.30 0
2010-11-21 Multi-Stage Fracture 2247.50 2248.70 0
2010-11-21 Multi-Stage Fracture 2169.60 2170.80 0
2010-11-21 Multi-Stage Fracture 2062.20 2063.50 0
2010-11-21 Multi-Stage Fracture 1999.30 2000.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 356 0.0 0.0 0.0
2011 8709 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8704 0.0 0.0 0.0
2014 8711 0.0 0.0 0.0
2015 8697 0.0 0.0 0.0
2016 8699 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8735 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References