X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495042008030

Well Details

Well ID: 0495042008030
Loading map...
Location: 03/08-20-049-04W5/0
Location Alias: 03/08-20-49-04 W5M
Location Alias 2: 03/08-20-049-04 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 04
Section: 20
County/Municipality: Brazeau County
Well Name: BONTERRA 103 HZ PEMBINA 8-20-49-4
Operator Name: Bonterra Energy Corp.
License Number: 0478247
License Date: 2015-12-07
License Status: Issued
Spud Date: 2016-07-19
Final Drill Date: 2016-07-23
Well Total Depth: 2848.00 m
Surface Hole Latitude: 53.240169
Surface Hole Longitude: -114.565016

For data sources see[1][2]

Well History

Date Event
2015-12-07 Obtained License
2016-07-20 Surface Casing Operation Performed
2016-07-21 Direction Drilling Operation Performed - Deviate
2016-07-22 Direction Drilling Operation Performed - Horizontal
2016-07-23 Finished Drilling
2016-07-23 Well Log Performed
2016-07-23 Well Mode changed to Drilled and Cased
2016-07-24 Production Casing Operation Performed
2016-07-24 Rig Released
2016-09-17 Perforation Treatment Performed - Multi-Stage Fracture
2016-10-06 Well Began Production
2016-10-06 Well Fluid changed to Crude Oil
2016-10-06 Well Mode changed to Pumping

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2016-07-19 Ironhand Drilling Inc. 1 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2016-07-21 935.70 Deviate (5 - 79 degrees)
2016-07-22 1388.20 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2016-09-17 Multi-Stage Fracture 2809.50 2810.00 0
2016-09-17 Multi-Stage Fracture 2327.50 2329.40 0
2016-09-17 Multi-Stage Fracture 2273.30 2275.20 0
2016-09-17 Multi-Stage Fracture 2219.40 2221.30 0
2016-09-17 Multi-Stage Fracture 2164.90 2166.80 0
2016-09-17 Multi-Stage Fracture 2110.80 2112.70 0
2016-09-17 Multi-Stage Fracture 2056.70 2058.60 0
2016-09-17 Multi-Stage Fracture 2002.40 2004.30 0
2016-09-17 Multi-Stage Fracture 1948.30 1950.20 0
2016-09-17 Multi-Stage Fracture 1894.90 1896.80 0
2016-09-17 Multi-Stage Fracture 1841.40 1843.30 0
2016-09-17 Multi-Stage Fracture 2757.40 2759.30 0
2016-09-17 Multi-Stage Fracture 1787.90 1789.80 0
2016-09-17 Multi-Stage Fracture 1734.40 1736.30 0
2016-09-17 Multi-Stage Fracture 1680.60 1682.50 0
2016-09-17 Multi-Stage Fracture 1626.50 1628.40 0
2016-09-17 Multi-Stage Fracture 1573.10 1575.00 0
2016-09-17 Multi-Stage Fracture 1519.30 1521.20 0
2016-09-17 Multi-Stage Fracture 1465.80 1467.70 0
2016-09-17 Multi-Stage Fracture 1424.50 1426.40 0
2016-09-17 Multi-Stage Fracture 2703.70 2705.60 0
2016-09-17 Multi-Stage Fracture 2650.30 2652.20 0
2016-09-17 Multi-Stage Fracture 2596.60 2598.50 0
2016-09-17 Multi-Stage Fracture 2542.90 2544.80 0
2016-09-17 Multi-Stage Fracture 2489.20 2491.10 0
2016-09-17 Multi-Stage Fracture 2435.50 2437.40 0
2016-09-17 Multi-Stage Fracture 2381.50 2383.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2016-09-17 2016-09-17 1,264 2,677 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 water Not Available 100 85.3246 N/A
Sand - Tier 2 (20/40) Trican silica crystalline 14808-60-7 100 6.1147 N/A
Sand - Tier 2 (30/50) Trican silica crystalline 14808-60-7 100 8.3058 N/A
AQUCAR DB20 Trican Bactericide/Biocide 2.2-dibromo-3-nitrilopropionamide 10222-01-2 100 0.0339 N/A
2-mercaptoethanol 60-24-2 100 0.0339 N/A
dibromoacetonitrile 3252-43-5 100 0.0338 N/A
non-hazardous ingredients Not Available 100 0.0339 N/A
sodium bromide 7647-15-6 100 0.0339 N/A
GBO-1 Trican Breaker sodium perborate tetrahydrate 10486-00-7 100 0.0031 N/A
CC-7 Trican Clay Control 1.6-hexanediamine. dihydrochloride 6055-52-3 100 0.0919 N/A
water Not Available 100 0.0919 N/A
DF-1 Trican Defoamer non-hazardous ingredients Not Available 100 0.0042 N/A
GFR-5D Trican Friction Reducer anionic polyacrylamide Not Available 100 0.0656 N/A
S-17W Trican Surfactant ethylene/propylene oxide polymer Not Available 100 0.0363 N/A
methanol 67-56-1 100 0.0363 N/A
water Not Available 100 0.0363 N/A
SS-7 Trican Surfactant aliphatic alcohol 9338 100 0.0192 N/A
aminofunctional polymer 9338 100 0.0192 N/A
distillates (petroleum). sweet medium 64741-86-2 100 0.0192 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2016-09-14 2016-09-17 Oilfield Produced Water 2798

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2016 1988 0.0 0.0 0.0
2017 8542 0.0 0.0 0.0
2018 8001 0.0 0.0 0.0
2019 6904 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-07-24 No Incident Encountered 0.00 0.00
2016-09-17 No Incident Encountered 0.00 0.00

For data sources see[10]

References