If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495040612000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.209986,"lon":-114.56383,"icon":""}]} |
Location: 00/12-06-049-04W5/0 | |
Location Alias: 00/12-06-49-04 W5M | |
Location Alias 2: 00/12-06-049-04 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 04 | |
Section: 06 | |
County/Municipality: Brazeau County | |
Well Name: ARC HZ PEMBINA 12-6-49-4 | |
Operator Name: ARC Resources Ltd. | |
License Number: 0460163 | |
License Date: 2013-10-21 | |
License Status: Issued | |
Spud Date: 2013-11-29 | |
Final Drill Date: 2013-12-12 | |
Well Total Depth: 3373.00 m | |
Surface Hole Latitude: 53.209986 | |
Surface Hole Longitude: -114.563830 |
Date | Event |
---|---|
2013-10-21 | Obtained License |
2013-11-30 | Surface Casing Operation Performed |
2013-12-04 | Direction Drilling Operation Performed - Deviate |
2013-12-05 | Direction Drilling Operation Performed - Horizontal |
2013-12-06 | Intermediate Casing Operation Performed |
2013-12-07 | Intermediate Casing Operation Performed |
2013-12-12 | Finished Drilling |
2013-12-12 | Well Log Performed |
2013-12-12 | Well Mode changed to Drilled and Cased |
2013-12-13 | Liner Casing Operation Performed |
2013-12-13 | Well Log Performed |
2013-12-14 | Perforation Treatment Performed - Open-Hole Completion |
2013-12-14 | Rig Released |
2014-02-20 | Perforation Treatment Performed - Multi-Stage Fracture |
2014-03-31 | Well Began Production |
2014-03-31 | Well Fluid changed to Crude Oil |
2014-03-31 | Well Mode changed to Pumping |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2013-11-29 | Excalibur Drilling Ltd. | 9 | N/A | Set Surface |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2013-12-04 | 990.00 | Deviate (5 - 79 degrees) |
2013-12-05 | 1440.00 | Horizontal |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2013-12-14 | Open Hole/Barefoot Completion | 3353.00 | 3373.00 | 0 |
2014-02-20 | Multi-Stage Fracture | 2515.50 | 2515.60 | 0 |
2014-02-20 | Multi-Stage Fracture | 2419.70 | 2419.80 | 0 |
2014-02-20 | Multi-Stage Fracture | 2323.70 | 2323.80 | 0 |
2014-02-20 | Multi-Stage Fracture | 2190.10 | 2190.20 | 0 |
2014-02-20 | Multi-Stage Fracture | 2009.10 | 2009.20 | 0 |
2014-02-20 | Multi-Stage Fracture | 1857.80 | 1857.90 | 0 |
2014-02-20 | Multi-Stage Fracture | 1753.40 | 1753.50 | 0 |
2014-02-20 | Multi-Stage Fracture | 1653.10 | 1653.20 | 0 |
2014-02-20 | Multi-Stage Fracture | 1555.20 | 1555.30 | 0 |
2014-02-20 | Multi-Stage Fracture | 3348.40 | 3348.50 | 0 |
2014-02-20 | Multi-Stage Fracture | 3274.50 | 3274.60 | 0 |
2014-02-20 | Multi-Stage Fracture | 3179.00 | 3179.10 | 0 |
2014-02-20 | Multi-Stage Fracture | 3085.90 | 3086.00 | 0 |
2014-02-20 | Multi-Stage Fracture | 2989.60 | 2989.70 | 0 |
2014-02-20 | Multi-Stage Fracture | 2803.10 | 2803.20 | 0 |
2014-02-20 | Multi-Stage Fracture | 2707.20 | 2707.30 | 0 |
2014-02-20 | Multi-Stage Fracture | 2610.90 | 2611.00 | 0 |
For data sources see[6]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-02-20 | 2014-02-20 | 1,316 | 528 | N/A |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Nitrogen | 7727-37-9 | 100 | 16.4331 | N/A | |||
Water | Not Available | 100 | 49.3966 | N/A | ||||
100 Mesh | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 1.5903 | N/A | ||
20/40 | Sanjel | Crystalline Silica | 14808-60-7 | 100 | 31.806 | N/A | ||
B-1008 | Sanjel | Bactericide/Biocide | BNPD | 52-51-7 | 100 | 0.005 | N/A | |
Methyl Alcohol | 67-56-1 | 100 | 0.005 | N/A | ||||
Breaker-1Z | Sanjel | Breaker | Cellulase enzyme | 9012-54-8 | 100 | 0.0461 | N/A | |
Ethylene Glycol | 107-21-1 | 100 | 0.05 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0488 | N/A | ||||
Water | Not Available | 100 | 0.0491 | N/A | ||||
BUFFER-A | Sanjel | Buffer | Acetic Acid | 64-19-7 | 100 | 0.1001 | N/A | |
Water | Not Available | 100 | 0.1001 | N/A | ||||
SCC-6L | Sanjel | Clay Control | 1.6-Hexanediamine dihydrochloride | 6055-52-3 | 100 | 0.0974 | N/A | |
Non-Hazardous Ingredients | Not Available | 100 | 0.0974 | N/A | ||||
FA-1 | Sanjel | Foamer | Ammonium C8-10 Alcohol | 68891-29-2 | 100 | 0.1881 | N/A | |
Ethanol | 64-17-5 | 100 | 0.1881 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.1881 | N/A | ||||
WG-6ZL | Sanjel | Gelling Agent | Polysaccharide Suspension | Not Available | 100 | 0.3096 | N/A | |
NE-5 | Sanjel | Surfactant | Alkyl benzenesulfonic acid | 68584-22-5 | 100 | 0.0242 | N/A | |
Diethylenetriamine | 111-40-0 | 100 | 0.0243 | N/A | ||||
Isopropyl Alcohol | 67-63-0 | 100 | 0.0242 | N/A | ||||
Non-Hazardous Ingredients | Not Available | 100 | 0.0243 | N/A |
For data sources see[7]
Water Diversion Start Date | Water Diversion End Date | Water Source Type | Total Water Volume (m3) |
---|---|---|---|
2014-02-17 | 2014-02-17 | Surface Water - Runoff | 559 |
For data sources see[8]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2014 | 6232 | 0.0 | 0.0 | 0.0 |
2015 | 8717 | 0.0 | 0.0 | 0.0 |
2016 | 8757 | 0.0 | 0.0 | 0.0 |
2017 | 8499 | 0.0 | 0.0 | 0.0 |
2018 | 8633 | 0.0 | 0.0 | 0.0 |
2019 | 8724 | 0.0 | 0.0 | 0.0 |
2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[9]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-12-14 | No Incident Encountered | 0.00 | 0.00 |
2014-03-04 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[10]