X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495040214000

Well Details

Well ID: 0495040214000
Loading map...
Location: 00/14-02-049-04W5/0
Location Alias: 00/14-02-49-04 W5M
Location Alias 2: 00/14-02-049-04 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 04
Section: 02
County/Municipality: Leduc County
Well Name: 1598385 Alberta PEMBINA 14-2-49-4
Operator Name: Bonterra Energy Corp.
License Number: 0016058
License Date: 1958-10-17
License Status: Issued
Spud Date: 1958-10-21
Final Drill Date: 1958-10-28
Well Total Depth: 1274.10 m
Surface Hole Latitude: 53.205258
Surface Hole Longitude: -114.479930

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-10-17 Obtained License
1958-10-26 Drill Stem Test Performed
1958-10-28 Finished Drilling
1958-10-28 Well Mode changed to Drilled and Cased
1958-10-29 Production Casing Operation Performed
1958-10-30 Perforation Treatment Performed - Bullet Perforation
1958-10-31 Perforation Treatment Performed - Acid Wash - No Pressure
1958-10-31 Perforation Treatment Performed - Fractured
1958-11-04 Well Began Production
1958-11-04 Well Fluid changed to Crude Oil
1958-11-04 Well Mode changed to Flowing
1975-06-12 Perforation Treatment Performed - Acid Wash - No Pressure
1975-06-12 Perforation Treatment Performed - Jet Perforation
1976-09-29 Well Fluid changed to Crude Oil
1976-09-29 Well Mode changed to Pumping
1976-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-30 Perforation Treatment Performed - Fractured
1989-11-20 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-10-30 Bullet Perforation 1239.30 1242.10 13
1958-10-31 Acid Wash 1239.30 1242.10 0
1958-10-31 Fracture 1239.30 1242.10 0
1975-06-12 Perforation 1235.90 1239.30 7
1975-06-12 Perforation 1242.10 1250.90 7
1975-06-12 Acid Wash 1235.90 1250.90 0
1976-09-30 Acid Treatment 1235.90 1250.90 0
1976-09-30 Fracture 1235.90 1250.90 0
1989-11-20 Acid Treatment 1235.90 1250.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 456 0.0 0.0 0.0
1968 1156 0.0 0.0 0.0
1969 2474 0.0 0.0 0.0
1970 4448 0.0 0.0 0.0
1971 5290 0.0 0.0 0.0
1972 7656 0.0 0.0 0.0
1973 3906 0.0 0.0 0.0
1974 8160 0.0 0.0 0.0
1975 6380 0.0 0.0 0.0
1976 5592 0.0 0.0 0.0
1977 4800 0.0 0.0 0.0
1978 4944 0.0 0.0 0.0
1979 4332 0.0 0.0 0.0
1980 5124 0.0 0.0 0.0
1981 4223 0.0 0.0 0.0
1982 7535 0.0 0.0 0.0
1983 8423 0.0 0.0 0.0
1984 7932 0.0 0.0 0.0
1985 8131 0.0 0.0 0.0
1986 7792 0.0 0.0 0.0
1987 8225 0.0 0.0 0.0
1988 7787 0.0 0.0 0.0
1989 5635 0.0 0.0 0.0
1990 6870 0.0 0.0 0.0
1991 8759 0.0 0.0 0.0
1992 8687 0.0 0.0 0.0
1993 8567 0.0 0.0 0.0
1994 8727 0.0 0.0 0.0
1995 8705 0.0 0.0 0.0
1996 8615 0.0 0.0 0.0
1997 8736 0.0 0.0 0.0
1998 8663 0.0 0.0 0.0
1999 6789 0.0 0.0 0.0
2000 8557 0.0 0.0 0.0
2001 8406 0.0 0.0 0.0
2002 8653 0.0 0.0 0.0
2003 7999 0.0 0.0 0.0
2004 8709 0.0 0.0 0.0
2005 8445 0.0 0.0 0.0
2006 8265 0.0 0.0 0.0
2007 7134 0.0 0.0 0.0
2008 5298 0.0 0.0 0.0
2009 8666 0.0 0.0 0.0
2010 7704 0.0 0.0 0.0
2011 8460 0.0 0.0 0.0
2012 8477 0.0 0.0 0.0
2013 8529 0.0 0.0 0.0
2014 8607 0.0 0.0 0.0
2015 8648 0.0 0.0 0.0
2016 8606 0.0 0.0 0.0
2017 8684 0.0 0.0 0.0
2018 8480 0.0 0.0 0.0
2019 8706 0.0 0.0 0.0
2020 2167 0.0 0.0 0.0

For data sources see[5]

References