X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0495033406000

Well Details

Well ID: 0495033406000
Loading map...
Location: 00/06-34-049-03W5/0
Location Alias: 00/06-34-49-03 W5M
Location Alias 2: 00/06-34-049-03 W5/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 5
Range: 03
Section: 34
County/Municipality: Leduc County
Well Name: JOURNEY PEMBINA 6-34-49-3
Operator Name: Journey Energy Inc.
License Number: 0092161
License Date: 1981-09-10
License Status: Suspension
Spud Date: 1981-09-12
Final Drill Date: 1981-09-24
Well Total Depth: 1670.00 m
Surface Hole Latitude: 53.269328
Surface Hole Longitude: -114.360612

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1981-09-10 Obtained License
1981-09-21 Kick Occurred
1981-09-24 Finished Drilling
1981-09-24 Well Log Performed
1981-09-25 Drill Stem Test Performed
1981-09-26 Production Casing Operation Performed
1981-10-01 Perforation Treatment Performed - Jet Perforation
1981-10-01 Well Mode changed to Drilled and Cased
2008-09-13 Well Log Performed
2008-09-14 Well Log Performed
2008-09-16 Well Log Performed
2008-09-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-17 Perforation Treatment Performed - Jet Perforation
2008-09-17 Plug Back Performed
2008-09-17 Well Log Performed
2008-09-17 Well Mode changed to Abandoned Zone
2008-09-18 Perforation Treatment Performed - Remedial Casing
2008-09-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-19 Perforation Treatment Performed - Jet Perforation
2008-09-19 Well Log Performed
2008-09-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-09-20 Perforation Treatment Performed - Remedial Casing
2008-09-21 Perforation Treatment Performed - Jet Perforation
2008-09-21 Well Log Performed
2008-09-22 Perforation Treatment Performed - Remedial Casing
2008-09-24 Well Log Performed
2008-09-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1981-10-01 Perforation 1588.50 1591.50 13
2008-09-22 Remedial Casing Cementing 504.00 505.00 0
2008-09-25 Packing Device Capped w/Cement 405.00 495.00 0
2008-09-17 Packing Device Capped w/Cement 1570.00 1580.00 0
2008-09-17 Perforation 709.00 710.00 17
2008-09-18 Remedial Casing Cementing 709.00 710.00 0
2008-09-19 Packing Device Capped w/Cement 691.00 701.90 0
2008-09-19 Perforation 624.00 625.00 6
2008-09-20 Remedial Casing Cementing 624.00 625.00 0
2008-09-20 Packing Device Capped w/Cement 606.80 616.80 0
2008-09-21 Perforation 504.00 505.00 6

For data sources see[4]


Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1981-09-21 Kick 1609.50 1609.50

For data sources see[5]

References