If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0495010612004 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.202451,"lon":-114.145526,"icon":""}]} |
Location: 00/12-06-049-01W5/4 | |
Location Alias: 00/12-06-49-01 W5M | |
Location Alias 2: 00/12-06-049-01 W5/04 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 5 | |
Range: 01 | |
Section: 06 | |
County/Municipality: Leduc County | |
Well Name: SPL PEMBINA 12-6-49-1 | |
Operator Name: Spur Petroleum Ltd. | |
License Number: 0155031 | |
License Date: 1992-12-08 | |
License Status: Issued | |
Spud Date: 1992-12-10 | |
Final Drill Date: 1992-12-17 | |
Well Total Depth: 1661.00 m | |
Surface Hole Latitude: 53.202451 | |
Surface Hole Longitude: -114.145526 |
Date | Event |
---|---|
1992-12-08 | Obtained License |
1992-12-11 | Surface Casing Operation Performed |
1992-12-17 | Finished Drilling |
1992-12-17 | Well Log Performed |
1992-12-17 | Well Mode changed to Drilled and Cased |
1992-12-18 | Well Log Performed |
1992-12-19 | Production Casing Operation Performed |
1992-12-19 | Rig Released |
1993-01-11 | Perforation Treatment Performed - Jet Perforation |
1993-01-12 | Well Log Performed |
1993-01-15 | Perforation Treatment Performed - Fractured |
1993-01-19 | Well Log Performed |
1996-09-30 | Perforation Treatment Performed - Jet Perforation |
1996-09-30 | Well Log Performed |
1998-01-04 | Perforation Treatment Performed - Jet Perforation |
2000-09-09 | Perforation Treatment Performed - Jet Perforation |
2000-09-09 | Well Log Performed |
2005-06-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-06-11 | Plug Back Performed |
2005-06-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-06-12 | Plug Back Performed |
2005-06-25 | Well Log Performed |
2005-06-28 | Perforation Treatment Performed - Jet Perforation |
2005-07-26 | Well Began Production |
2005-07-26 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-07-26 | Well Mode changed to Flowing |
2011-12-04 | Well Fluid changed to Gas |
2011-12-04 | Well Mode changed to Suspended |
2012-11-01 | Well Fluid changed to Coalbed Methane-Coals Only |
2012-11-01 | Well Mode changed to Flowing |
2014-07-07 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1993-01-11 | Perforation | 1546.00 | 1551.00 | 13 |
2005-06-28 | Perforation | 489.70 | 490.30 | 17 |
2005-06-28 | Perforation | 481.50 | 482.50 | 17 |
2005-06-28 | Perforation | 473.00 | 474.00 | 17 |
2005-06-28 | Perforation | 456.50 | 458.00 | 17 |
2005-06-28 | Perforation | 401.00 | 402.00 | 17 |
2005-06-28 | Perforation | 394.50 | 395.50 | 17 |
2005-06-28 | Perforation | 378.00 | 379.00 | 17 |
1993-01-15 | Fracture | 1546.00 | 1551.00 | 0 |
1996-09-30 | Perforation | 1538.00 | 1542.00 | 18 |
1996-09-30 | Perforation | 1543.50 | 1551.00 | 18 |
1998-01-04 | Perforation | 1392.00 | 1394.50 | 18 |
2000-09-09 | Perforation | 1614.50 | 1625.00 | 17 |
2005-06-11 | Packing Device Capped w/Cement | 1593.80 | 1601.80 | 0 |
2005-06-11 | Packing Device Capped w/Cement | 1522.00 | 1530.00 | 0 |
2005-06-12 | Packing Device Capped w/Cement | 1375.00 | 1383.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 3603 | 0.0 | 0.0 | 0.0 |
2006 | 8679 | 0.0 | 0.0 | 0.0 |
2007 | 8569 | 0.0 | 0.0 | 0.0 |
2008 | 8144 | 0.0 | 0.0 | 0.0 |
2009 | 8136 | 0.0 | 0.0 | 0.0 |
2010 | 8227 | 0.0 | 0.0 | 0.0 |
2011 | 7574 | 0.0 | 0.0 | 0.0 |
2012 | 1416 | 0.0 | 0.0 | 0.0 |
2013 | 8361 | 0.0 | 0.0 | 0.0 |
2014 | 8337 | 0.0 | 0.0 | 0.0 |
2015 | 8597 | 0.0 | 0.0 | 0.0 |
2016 | 8576 | 0.0 | 0.0 | 0.0 |
2017 | 7502 | 0.0 | 0.0 | 0.0 |
2018 | 5783 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]