X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494280214000

Well Details

Well ID: 0494280214000
Loading map...
Location: 00/14-02-049-28W4/0
Location Alias: 00/14-02-49-28 W4M
Location Alias 2: 00/14-02-049-28 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 28
Section: 02
County/Municipality: Leduc County
Well Name: CYPRESS ET AL THORSBY 14-2-49-28
Operator Name: TAQA North Ltd.
License Number: 0114597
License Date: 1985-05-14
License Status: Re-Entered
Spud Date: 1985-06-04
Final Drill Date: 1985-06-14
Well Total Depth: 1615.00 m
Surface Hole Latitude: 53.203895
Surface Hole Longitude: -113.989243

For data sources see[1][2]

Well History

Date Event
1985-05-14 Obtained License
1985-06-06 Surface Casing Operation Performed
1985-06-14 Finished Drilling
1985-06-14 Well Log Performed
1985-06-16 Production Casing Operation Performed
1985-06-16 Rig Released
1985-07-02 Well Log Performed
1985-07-04 Perforation Treatment Performed - Jet Perforation
1985-07-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1985-07-06 Well Mode changed to Drilled and Cased
1991-07-17 Well Began Production
1991-07-17 Well Fluid changed to Gas
1991-07-17 Well Mode changed to Flowing
1992-05-19 Perforation Treatment Performed - Jet Perforation
1992-05-19 Well Log Performed
1992-05-20 Perforation Treatment Performed - Cement Squeeze
1992-05-22 Well Log Performed
1992-05-23 Perforation Treatment Performed - Jet Perforation
1992-05-26 Perforation Treatment Performed - Fractured
1992-05-26 Well Log Performed
1995-06-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-25 Plug Back Performed
1995-06-25 Well Fluid changed to Gas
1995-06-25 Well Mode changed to Abandoned Zone
1995-06-26 Perforation Treatment Performed - Jet Perforation
1995-06-26 Well Log Performed
1995-06-27 Perforation Treatment Performed - Cement Squeeze
1995-06-27 Well Log Performed
1995-06-29 Perforation Treatment Performed - Jet Perforation
1995-06-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-06-30 Perforation Treatment Performed - Jet Perforation
1995-06-30 Plug Back Performed
1995-06-30 Well Log Performed
1995-07-01 Well Log Performed
1996-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-03-03 Plug Back Performed
1996-03-03 Well Abandoned
1996-03-03 Well Fluid changed to Gas
1996-03-03 Well Log Performed
1996-03-03 Well Mode changed to Abandoned
2001-05-13 Well Fluid changed to Gas
2001-05-13 Well Mode changed to Abandoned and Re-entered

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1985-07-04 Perforation 1511.50 1513.00 13
1995-06-29 Perforation 752.00 757.00 13
1995-06-30 Packing Device Capped w/Cement 741.00 749.00 0
1995-06-30 Perforation 709.00 712.50 13
1996-03-03 Packing Device Capped w/Cement 697.00 705.00 0
1985-07-05 Acid Treatment 1511.50 1513.00 0
1992-05-19 Perforation 1516.20 1516.70 13
1992-05-20 Cement Squeeze 1511.50 1516.70 0
1992-05-23 Perforation 1511.50 1513.00 13
1992-05-26 Fracture 1511.50 1513.00 0
1995-06-25 Packing Device Capped w/Cement 1498.00 1506.00 0
1995-06-26 Perforation 780.00 781.00 18
1995-06-27 Cement Squeeze 780.00 781.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 878 0.0 0.0 0.0
1992 166 0.0 0.0 0.0

For data sources see[5]

References