X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494273612000

Well Details

Well ID: 0494273612000
Loading map...
Location: 00/12-36-049-27W4/0
Location Alias: 00/12-36-49-27 W4M
Location Alias 2: 00/12-36-049-27 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 27
Section: 36
County/Municipality: Leduc County
Well Name: TEXACO CALMAR NO. 9
Operator Name: Imperial Oil Resources Limited
License Number: 0002934
License Date: 1951-05-25
License Status: RecExempt
Spud Date: 1951-06-04
Final Drill Date: 1951-07-06
Well Total Depth: 1686.20 m
Surface Hole Latitude: 53.274102
Surface Hole Longitude: -113.827702

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-05-25 Obtained License
1951-06-18 Drill Stem Test Performed
1951-06-19 Drill Stem Test Performed
1951-06-30 Drill Stem Test Performed
1951-07-03 Drill Stem Test Performed
1951-07-05 Drill Stem Test Performed
1951-07-06 Drill Stem Test Performed
1951-07-06 Finished Drilling
1951-07-06 Well Mode changed to Drilled and Cased
1951-07-07 Production Casing Operation Performed
1951-07-10 Perforation Treatment Performed - Bullet Perforation
1951-07-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-07-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-07-14 Well Began Production
1951-07-14 Well Fluid changed to Crude Oil
1951-07-14 Well Mode changed to Flowing
1951-08-03 Well Fluid changed to Crude Oil
1951-08-03 Well Mode changed to Pumping
1953-10-20 Perforation Treatment Performed - Cement Plug
1953-11-02 Well Abandoned
1953-11-02 Well Fluid changed to Crude Oil
1953-11-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-07-10 Bullet Perforation 1589.80 1591.10 13
1951-07-10 Bullet Perforation 1592.30 1593.50 13
1951-07-10 Bullet Perforation 1595.30 1598.70 13
1951-07-10 Bullet Perforation 1600.20 1601.40 13
1951-07-12 Acid Treatment 1589.80 1601.40 0
1951-07-13 Acid Treatment 1589.80 1601.40 0
1953-10-20 Cement Plug 1577.30 1623.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References