X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494270203020

Well Details

Well ID: 0494270203020
Loading map...
Location: 02/03-02-049-27W4/0
Location Alias: 02/03-02-49-27 W4M
Location Alias 2: 02/03-02-049-27 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 27
Section: 02
County/Municipality: Leduc County
Well Name: CLEARBROOK GLENPK 3-2-49-27
Operator Name: Enhance Energy Inc.
License Number: 0004201
License Date: 1952-02-09
License Status: Suspension
Spud Date: 1952-03-08
Final Drill Date: 1952-04-09
Well Total Depth: 1690.70 m
Surface Hole Latitude: 53.194241
Surface Hole Longitude: -113.845241

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-02-09 Obtained License
1952-04-07 Drill Stem Test Performed
1952-04-08 Drill Stem Test Performed
1952-04-09 Drill Stem Test Performed
1952-04-09 Finished Drilling
1952-04-09 Well Mode changed to Drilled and Cased
1952-04-12 Perforation Treatment Performed - Open-Hole Completion
1952-04-12 Production Casing Operation Performed
1952-04-18 Well Began Production
1952-04-18 Well Fluid changed to Crude Oil
1952-04-18 Well Mode changed to Flowing
1952-05-04 Perforation Treatment Performed - Jet Perforation
1952-07-27 Drill Stem Test Performed
1952-07-27 Perforation Treatment Performed - Cement Squeeze
1952-08-04 Perforation Treatment Performed - Open-Hole Completion
1958-01-15 Well Fluid changed to Crude Oil
1958-01-15 Well Mode changed to Pumping
1962-02-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1970-01-12 Well Fluid changed to Crude Oil
1970-01-12 Well Mode changed to Suspended
2008-10-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-10-03 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-04-12 Open Hole/Barefoot Completion 1686.20 1690.70 0
1952-05-04 Perforation 1683.70 1684.30 13
1952-07-27 Cement Squeeze 1683.70 1690.70 0
1952-08-04 Open Hole/Barefoot Completion 1686.20 1690.70 0
1962-02-02 Acid Treatment 1686.20 1690.70 0
2008-10-02 Packing Device Capped w/Cement 1667.00 1675.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 1739 0.0 0.0 0.0
1968 6625 0.0 0.0 0.0
1969 6411 0.0 0.0 0.0

For data sources see[5]

References