X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494263601000

Well Details

Well ID: 0494263601000
Loading map...
Location: 00/01-36-049-26W4/0
Location Alias: 00/01-36-49-26 W4M
Location Alias 2: 00/01-36-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 36
County/Municipality: Leduc County
Well Name: IMPERIAL LEDUC NO. 497
Operator Name: Imperial Oil Resources Limited
License Number: 0005121
License Date: 1952-08-12
License Status: RecCertified
Spud Date: 1952-08-22
Final Drill Date: 1952-09-20
Well Total Depth: 1643.20 m
Surface Hole Latitude: 53.266875
Surface Hole Longitude: -113.662321

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-08-12 Obtained License
1952-08-29 Drill Stem Test Performed
1952-08-30 Drill Stem Test Performed
1952-09-01 Liner Casing Operation Performed
1952-09-04 Drill Stem Test Performed
1952-09-11 Drill Stem Test Performed
1952-09-12 Drill Stem Test Performed
1952-09-19 Drill Stem Test Performed
1952-09-20 Drill Stem Test Performed
1952-09-20 Finished Drilling
1952-09-20 Well Mode changed to Drilled and Cased
1952-09-21 Drill Stem Test Performed
1952-09-22 Drill Stem Test Performed
1952-09-24 Perforation Treatment Performed - Bullet Perforation
1952-09-29 Well Began Production
1952-09-29 Well Fluid changed to Crude Oil
1952-09-29 Well Mode changed to Flowing
1961-07-01 Well Type changed to Observation
1961-07-19 Perforation Treatment Performed - Jet Perforation
1961-07-21 Perforation Treatment Performed - Selective Bullet Perforations
1961-09-02 Perforation Treatment Performed - Bullet Perforation
1976-09-30 Perforation Treatment Performed - Cement Squeeze
1976-10-01 Perforation Treatment Performed - Cement Plug
1976-10-05 Perforation Treatment Performed - Jet Perforation
1976-10-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-08-26 Perforation Treatment Performed - Cement Squeeze
1977-09-07 Well Fluid changed to Crude Oil
1977-09-07 Well Mode changed to Pumping
1986-07-09 Well Fluid changed to Crude Oil
1986-07-09 Well Mode changed to Suspended
1987-12-14 Well Log Performed
1987-12-15 Perforation Treatment Performed - Cement Squeeze
1987-12-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-12-16 Perforation Treatment Performed - Jet Perforation
1987-12-16 Well Log Performed
1988-01-08 Well Fluid changed to Crude Oil
1988-01-08 Well Mode changed to Pumping
1991-08-01 Well Fluid changed to Crude Oil
1991-08-01 Well Mode changed to Suspended
1995-11-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-11-09 Plug Back Performed
1995-11-09 Well Fluid changed to Crude Oil
1995-11-09 Well Mode changed to Abandoned Zone
1995-11-19 Well Log Performed
1996-04-18 Well Abandoned
1996-04-18 Well Fluid changed to Crude Oil
1996-04-18 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-09-24 Bullet Perforation 1627.90 1629.50 13
1987-12-15 Cement Squeeze 1626.10 1626.70 0
1987-12-16 Perforation 1620.50 1621.00 13
1987-12-16 Acid Treatment 1620.50 1621.00 0
1995-11-09 Packing Device Capped w/Cement 1582.00 1590.00 0
1995-11-09 Packing Device Capped w/Cement 1287.00 1295.00 0
1961-07-19 Perforation 1641.30 1642.60 7
1961-07-21 Selective Bullet Perforations 1619.40 1619.40 0
1961-09-02 Bullet Perforation 1618.80 1619.10 13
1976-09-30 Cement Squeeze 1618.80 1629.50 0
1976-10-01 Cement Plug 1638.30 1643.20 0
1976-10-05 Perforation 1626.10 1626.70 7
1976-10-06 Acid Treatment 1626.10 1626.70 0
1977-08-26 Cement Squeeze 1618.80 1619.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1976 744 0.0 0.0 0.0
1977 2498 0.0 0.0 0.0
1978 8088 0.0 0.0 0.0
1979 8010 0.0 0.0 0.0
1980 7289 0.0 0.0 0.0
1981 7811 0.0 0.0 0.0
1982 7855 0.0 0.0 0.0
1983 8110 0.0 0.0 0.0
1984 7892 0.0 0.0 0.0
1985 7930 0.0 0.0 0.0
1986 3458 0.0 0.0 0.0
1988 6371 0.0 0.0 0.0
1989 8379 0.0 0.0 0.0
1990 8737 0.0 0.0 0.0
1991 4982 0.0 0.0 0.0

For data sources see[5]

References