X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494263513000

Well Details

Well ID: 0494263513000
Loading map...
Location: 00/13-35-049-26W4/0
Location Alias: 00/13-35-49-26 W4M
Location Alias 2: 00/13-35-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 35
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 13-35-49-26
Operator Name: NEP Canada ULC
License Number: 0000601
License Date: 1949-09-12
License Status: Suspension
Spud Date: 1949-09-27
Final Drill Date: 1949-11-05
Well Total Depth: 1646.20 m
Surface Hole Latitude: 53.277704
Surface Hole Longitude: -113.704746

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-09-12 Obtained License
1949-10-25 Drill Stem Test Performed
1949-11-01 Liner Casing Operation Performed
1949-11-05 Finished Drilling
1949-11-05 Well Mode changed to Drilled and Cased
1949-11-10 Perforation Treatment Performed - Bullet Perforation
1949-11-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-11-12 Well Began Production
1949-11-12 Well Fluid changed to Crude Oil
1949-11-12 Well Mode changed to Flowing
1950-02-22 Perforation Treatment Performed - Cement Squeeze
1950-02-28 Drill Stem Test Performed
1950-03-01 Perforation Treatment Performed - Jet Perforation
1950-03-01 Perforation Treatment Performed - Open-Hole Completion
1950-03-06 Perforation Treatment Performed - Bullet Perforation
1950-03-06 Perforation Treatment Performed - Jet Perforation
1950-03-07 Perforation Treatment Performed - Acid Wash - No Pressure
1950-03-08 Perforation Treatment Performed - Acid Wash - No Pressure
1950-03-10 Perforation Treatment Performed - Jet Perforation
1950-03-12 Perforation Treatment Performed - Cement Squeeze
1950-03-18 Perforation Treatment Performed - Acid Wash - No Pressure
1950-03-18 Perforation Treatment Performed - Jet Perforation
1950-03-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1986-02-20 Well Log Performed
1986-02-21 Perforation Treatment Performed - Cement Squeeze
1986-02-24 Perforation Treatment Performed - Jet Perforation
1986-02-24 Well Log Performed
1986-02-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-17 Well Fluid changed to Crude Oil
1990-10-17 Well Mode changed to Pumping
1995-08-19 Perforation Treatment Performed - Cement Squeeze
1995-08-20 Perforation Treatment Performed - Acid Wash - No Pressure
1995-08-20 Perforation Treatment Performed - Jet Perforation
1997-09-04 Perforation Treatment Performed - Cement Squeeze
1997-09-04 Plug Back Performed
1997-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-09-06 Perforation Treatment Performed - Jet Perforation
2000-10-03 Perforation Treatment Performed - Jet Perforation
2002-02-20 Perforation Treatment Performed - Acid Squeeze - Press Used
2014-11-01 Well Fluid changed to Crude Oil
2014-11-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-11-10 Bullet Perforation 1644.10 1645.30 20
1950-03-10 Perforation 1639.50 1639.80 13
1950-03-12 Cement Squeeze 1639.50 1642.30 0
1950-03-18 Acid Wash 1645.60 1645.90 0
1950-03-18 Perforation 1644.40 1645.90 10
1950-03-22 Acid Treatment 1644.70 1646.20 0
1986-02-21 Cement Squeeze 1642.00 1646.20 0
1986-02-24 Perforation 1638.30 1638.40 13
1986-02-25 Acid Treatment 1638.30 1638.40 0
1995-08-19 Cement Squeeze 1638.30 1638.40 0
1995-08-20 Perforation 1634.50 1634.80 13
1949-11-11 Acid Treatment 1644.10 1645.30 0
1995-08-20 Acid Wash 1634.50 1634.80 0
1997-09-04 Cement Squeeze 1634.50 1634.80 0
1997-09-06 Perforation 1629.50 1630.00 18
1997-09-06 Acid Treatment 1629.50 1630.00 0
2000-10-03 Perforation 1625.50 1627.50 17
2002-02-20 Acid Treatment 1629.50 1630.00 0
1950-02-22 Cement Squeeze 1644.10 1645.30 0
1950-03-01 Open Hole/Barefoot Completion 1645.60 1646.20 0
1950-03-01 Perforation 1644.70 1645.60 10
1950-03-06 Perforation 1642.00 1642.30 13
1950-03-06 Bullet Perforation 1642.00 1642.30 13
1950-03-07 Acid Wash 1642.00 1642.30 0
1950-03-08 Acid Wash 1642.00 1642.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1967 192 0.0 0.0 0.0
1986 5762 0.0 0.0 0.0
1987 8433 0.0 0.0 0.0
1988 8203 0.0 0.0 0.0
1989 8360 0.0 0.0 0.0
1990 8725 0.0 0.0 0.0
1991 8459 0.0 0.0 0.0
1992 8021 0.0 0.0 0.0
1993 8102 0.0 0.0 0.0
1994 8601 0.0 0.0 0.0
1995 7866 0.0 0.0 0.0
1996 8245 0.0 0.0 0.0
1997 8487 0.0 0.0 0.0
1998 7954 0.0 0.0 0.0
1999 8229 0.0 0.0 0.0
2000 8191 0.0 0.0 0.0
2001 8376 0.0 0.0 0.0
2002 8221 0.0 0.0 0.0
2003 8172 0.0 0.0 0.0
2004 8358 0.0 0.0 0.0
2005 8565 0.0 0.0 0.0
2006 7824 0.0 0.0 0.0
2007 8424 0.0 0.0 0.0
2008 8107 0.0 0.0 0.0
2009 8392 0.0 0.0 0.0
2010 7678 0.0 0.0 0.0
2011 8428 0.0 0.0 0.0
2012 8508 0.0 0.0 0.0
2013 5900 0.0 0.0 0.0

For data sources see[5]

References