X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494263114000

Well Details

Well ID: 0494263114000
Loading map...
Location: 00/14-31-049-26W4/0
Location Alias: 00/14-31-49-26 W4M
Location Alias 2: 00/14-31-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 31
County/Municipality: Leduc County
Well Name: CALMAR WEST NO. 2 WELL
Operator Name: Canadian Quantum Energy Corporation
License Number: 0000453
License Date: 1949-08-09
License Status: RecExempt
Spud Date: 1949-08-15
Final Drill Date: 1949-09-11
Well Total Depth: 1652.00 m
Surface Hole Latitude: 53.277672
Surface Hole Longitude: -113.796252

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1949-08-09 Obtained License
1949-09-10 Drill Stem Test Performed
1949-09-11 Finished Drilling
1949-09-11 Well Mode changed to Drilled and Cased
1949-09-12 Liner Casing Operation Performed
1949-09-16 Perforation Treatment Performed - Bullet Perforation
1949-09-17 Perforation Treatment Performed - Acid Wash - No Pressure
1949-09-20 Perforation Treatment Performed - Acid Wash - No Pressure
1949-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-09-22 Perforation Treatment Performed - Acid Wash - No Pressure
1949-09-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1949-09-24 Perforation Treatment Performed - Acid Wash - No Pressure
1949-09-24 Well Began Production
1949-09-24 Well Fluid changed to Crude Oil
1949-09-24 Well Mode changed to Pumping
1953-08-01 Drill Stem Test Performed
1953-08-05 Drill Stem Test Performed
1953-08-06 Drill Stem Test Performed
1953-08-11 Perforation Treatment Performed - Selective Bullet Perforations
1953-10-05 Perforation Treatment Performed - Cement Squeeze
1953-10-14 Perforation Treatment Performed - Selective Jet Perforations
1953-10-18 Perforation Treatment Performed - Cement Squeeze
1953-10-22 Perforation Treatment Performed - Selective Bullet Perforations
1953-10-22 Perforation Treatment Performed - Selective Jet Perforations
1953-10-27 Perforation Treatment Performed - Cement Squeeze
1953-11-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-11-01 Perforation Treatment Performed - Selective Jet Perforations
1953-11-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1953-11-05 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-11-05 Perforation Treatment Performed - Jet Perforation
1956-12-07 Well Fluid changed to Crude Oil
1956-12-07 Well Mode changed to Suspended
1958-06-06 Perforation Treatment Performed - Cement Plug
1958-06-12 Well Abandoned
1958-06-12 Well Fluid changed to Crude Oil
1958-06-12 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1949-09-16 Bullet Perforation 1572.80 1579.80 13
1953-10-05 Cement Squeeze 1649.00 1649.00 0
1953-10-14 Selective Jet Perforations 1649.00 1649.00 0
1953-10-18 Cement Squeeze 1649.00 1649.00 0
1953-10-22 Selective Jet Perforations 1649.00 1649.00 0
1953-10-22 Selective Bullet Perforations 1649.00 1649.00 0
1953-10-27 Cement Squeeze 1649.00 1649.00 0
1953-11-01 Selective Jet Perforations 1649.30 1649.30 0
1953-11-01 Acid Treatment 1649.30 1649.30 0
1953-11-04 Packing Device Capped w/Cement 1615.40 1630.70 0
1953-11-05 Perforation 1591.10 1594.10 13
1949-09-16 Bullet Perforation 1581.30 1582.20 13
1953-11-05 Perforation 1588.90 1590.40 13
1953-11-05 Acid Treatment 1588.90 1594.10 0
1958-06-06 Cement Plug 1554.50 1615.40 0
1949-09-17 Acid Wash 1572.80 1582.20 0
1949-09-20 Acid Wash 1572.80 1582.20 0
1949-09-22 Acid Wash 1572.80 1582.20 0
1949-09-22 Acid Treatment 1572.80 1582.20 0
1949-09-24 Acid Wash 1572.80 1582.20 0
1949-09-24 Acid Treatment 1572.80 1582.20 0
1953-08-11 Selective Bullet Perforations 1649.00 1649.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References