X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494263005000

Well Details

Well ID: 0494263005000
Loading map...
Location: 00/05-30-049-26W4/0
Location Alias: 00/05-30-49-26 W4M
Location Alias 2: 00/05-30-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 30
County/Municipality: Leduc County
Well Name: LEDUC CONSOLIDATED CALMAR NO. 3
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0002580
License Date: 1951-01-26
License Status: RecCertified
Spud Date: 1951-02-23
Final Drill Date: 1951-04-08
Well Total Depth: 1610.90 m
Surface Hole Latitude: 53.255999
Surface Hole Longitude: -113.802721

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-01-26 Obtained License
1951-04-07 Drill Stem Test Performed
1951-04-08 Drill Stem Test Performed
1951-04-08 Finished Drilling
1951-04-08 Well Mode changed to Drilled and Cased
1951-04-09 Drill Stem Test Performed
1951-04-11 Production Casing Operation Performed
1951-04-15 Perforation Treatment Performed - Open-Hole Completion
1951-04-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-04-16 Perforation Treatment Performed - Bullet Perforation
1951-04-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-04-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-04-30 Well Began Production
1951-04-30 Well Fluid changed to Crude Oil
1951-04-30 Well Mode changed to Pumping
1958-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-12-08 Perforation Treatment Performed - Cement Plug
1965-12-13 Well Abandoned
1965-12-13 Well Fluid changed to Crude Oil
1965-12-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-04-15 Open Hole/Barefoot Completion 1594.10 1610.90 0
1958-10-18 Acid Treatment 1593.50 1607.50 0
1960-11-17 Acid Treatment 1593.50 1607.50 0
1965-12-08 Cement Plug 1578.90 1610.90 0
1951-04-16 Bullet Perforation 1593.50 1594.70 13
1951-04-16 Bullet Perforation 1596.50 1597.80 13
1951-04-16 Bullet Perforation 1602.60 1604.50 13
1951-04-16 Bullet Perforation 1605.40 1605.70 13
1951-04-16 Bullet Perforation 1606.00 1607.50 13
1951-04-16 Acid Treatment 1593.50 1594.70 0
1951-04-26 Acid Treatment 1596.50 1607.50 0
1951-04-29 Acid Treatment 1593.50 1607.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References