If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494262412000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.245428,"lon":-113.680261,"icon":""}]} |
Location: 00/12-24-049-26W4/0 | |
Location Alias: 00/12-24-49-26 W4M | |
Location Alias 2: 00/12-24-049-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 26 | |
Section: 24 | |
County/Municipality: Leduc County | |
Well Name: TEXACO TEXCAN LEDUC IN 12-24-49-26 | |
Operator Name: Imperial Oil Resources Limited | |
License Number: 0002813 | |
License Date: 1951-04-26 | |
License Status: RecCertified | |
Spud Date: 1951-04-24 | |
Final Drill Date: 1951-05-18 | |
Well Total Depth: 1636.80 m | |
Surface Hole Latitude: 53.245428 | |
Surface Hole Longitude: -113.680261 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1951-04-26 | Obtained License |
1951-05-14 | Drill Stem Test Performed |
1951-05-16 | Drill Stem Test Performed |
1951-05-18 | Finished Drilling |
1951-05-18 | Well Mode changed to Drilled and Cased |
1951-05-19 | Production Casing Operation Performed |
1951-05-22 | Perforation Treatment Performed - Bullet Perforation |
1951-05-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1951-06-09 | Well Began Production |
1951-06-09 | Well Fluid changed to Crude Oil |
1951-06-09 | Well Mode changed to Pumping |
1951-06-29 | Perforation Treatment Performed - Bullet Perforation |
1951-06-29 | Perforation Treatment Performed - Cement Squeeze |
1951-07-08 | Perforation Treatment Performed - Cement Squeeze |
1951-07-23 | Perforation Treatment Performed - Bullet Perforation |
1951-07-29 | Perforation Treatment Performed - Bullet Perforation |
1951-08-10 | Perforation Treatment Performed - Cement Squeeze |
1951-08-11 | Perforation Treatment Performed - Bullet Perforation |
1957-05-10 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1958-05-10 | Perforation Treatment Performed - Cement Squeeze |
1958-05-12 | Perforation Treatment Performed - Bullet Perforation |
1958-05-13 | Well Began Injection |
1958-05-13 | Well Fluid changed to Water |
1958-05-13 | Well Type changed to Disposal |
1958-05-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1962-07-08 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1965-10-26 | Perforation Treatment Performed - Cement Plug |
1965-10-27 | Well Abandoned |
1965-10-27 | Well Fluid changed to Water |
1965-10-27 | Well Mode changed to Abandoned |
1965-10-27 | Well Type changed to Disposal |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1951-05-22 | Bullet Perforation | 1591.70 | 1593.50 | 13 |
1951-08-10 | Cement Squeeze | 1624.60 | 1626.40 | 0 |
1951-08-11 | Bullet Perforation | 1601.70 | 1618.50 | 20 |
1951-08-11 | Bullet Perforation | 1594.10 | 1597.20 | 20 |
1957-05-10 | Acid Treatment | 1594.10 | 1618.50 | 0 |
1958-05-10 | Cement Squeeze | 1601.70 | 1626.40 | 0 |
1958-05-12 | Bullet Perforation | 1625.20 | 1629.80 | 13 |
1958-05-16 | Acid Treatment | 1625.20 | 1629.80 | 0 |
1962-07-08 | Acid Treatment | 1625.20 | 1629.80 | 0 |
1965-10-26 | Cement Plug | 1589.50 | 1635.30 | 0 |
1951-05-22 | Bullet Perforation | 1603.90 | 1605.70 | 13 |
1951-05-22 | Bullet Perforation | 1607.50 | 1618.50 | 13 |
1951-05-24 | Acid Treatment | 1591.70 | 1618.50 | 0 |
1951-06-29 | Bullet Perforation | 1625.50 | 1625.80 | 33 |
1951-06-29 | Cement Squeeze | 1625.50 | 1625.80 | 0 |
1951-07-08 | Cement Squeeze | 1580.40 | 1624.90 | 0 |
1951-07-23 | Bullet Perforation | 1624.60 | 1626.40 | 13 |
1951-07-29 | Bullet Perforation | 1624.60 | 1626.40 | 20 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1962 | 0 | 0.0 | 0.0 | 0.0 |
1963 | 0 | 0.0 | 0.0 | 0.0 |
1964 | 0 | 0.0 | 0.0 | 0.0 |
1965 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]