X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494262409000

Well Details

Well ID: 0494262409000
Loading map...
Location: 00/09-24-049-26W4/0
Location Alias: 00/09-24-49-26 W4M
Location Alias 2: 00/09-24-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 24
County/Municipality: Leduc County
Well Name: TEXACO MCCOLL SOUTH LEDUC NO. 5 WELL
Operator Name: Imperial Oil Resources Limited
License Number: 0002524
License Date: 1951-01-11
License Status: RecCertified
Spud Date: 1951-01-13
Final Drill Date: 1951-02-06
Well Total Depth: 1627.60 m
Surface Hole Latitude: 53.244978
Surface Hole Longitude: -113.662300

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-01-11 Obtained License
1951-02-02 Drill Stem Test Performed
1951-02-04 Drill Stem Test Performed
1951-02-05 Drill Stem Test Performed
1951-02-06 Finished Drilling
1951-02-06 Well Mode changed to Drilled and Cased
1951-02-07 Production Casing Operation Performed
1951-02-11 Perforation Treatment Performed - Bullet Perforation
1951-02-11 Perforation Treatment Performed - Jet Perforation
1951-02-15 Perforation Treatment Performed - Acid Wash - No Pressure
1951-02-16 Well Began Production
1951-02-16 Well Fluid changed to Crude Oil
1951-02-16 Well Mode changed to Flowing
1954-10-17 Well Fluid changed to Crude Oil
1954-10-17 Well Mode changed to Pumping
1963-07-31 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1963-07-31 Perforation Treatment Performed - Bullet Perforation
1963-12-27 Perforation Treatment Performed - Cement Plug
1964-01-05 Well Abandoned
1964-01-05 Well Fluid changed to Crude Oil
1964-01-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-02-11 Bullet Perforation 1602.60 1612.40 7
1951-02-11 Perforation 1602.60 1612.40 7
1951-02-15 Acid Wash 1602.60 1612.40 0
1963-07-31 Packing Device Capped w/Cement 1598.70 1598.70 0
1963-07-31 Bullet Perforation 1590.10 1592.30 10
1963-12-27 Cement Plug 1570.30 1598.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0

For data sources see[5]

References