X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494262312000

Well Details

Well ID: 0494262312000
Loading map...
Location: 00/12-23-049-26W4/0
Location Alias: 00/12-23-49-26 W4M
Location Alias 2: 00/12-23-049-26 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 26
Section: 23
County/Municipality: Leduc County
Well Name: ALLENBEE LEDUC IN 12-23-49-26
Operator Name: Hariston Corporation
License Number: 0006124
License Date: 1953-02-27
License Status: RecCertified
Spud Date: 1953-03-04
Final Drill Date: 1953-03-30
Well Total Depth: 1638.90 m
Surface Hole Latitude: 53.244994
Surface Hole Longitude: -113.704651

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-02-27 Obtained License
1953-03-27 Drill Stem Test Performed
1953-03-28 Drill Stem Test Performed
1953-03-29 Drill Stem Test Performed
1953-03-30 Finished Drilling
1953-03-30 Well Mode changed to Drilled and Cased
1953-04-01 Production Casing Operation Performed
1953-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1953-04-02 Perforation Treatment Performed - Jet Perforation
1953-04-07 Well Began Production
1953-04-07 Well Fluid changed to Crude Oil
1953-04-07 Well Mode changed to Flowing
1956-05-11 Well Fluid changed to Crude Oil
1956-05-11 Well Mode changed to Pumping
1958-03-01 Perforation Treatment Performed - Cement Squeeze
1958-03-04 Perforation Treatment Performed - Jet Perforation
1958-03-05 Perforation Treatment Performed - Acid Wash - No Pressure
1958-03-10 Perforation Treatment Performed - Cement Squeeze
1958-03-15 Perforation Treatment Performed - Jet Perforation
1958-03-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1958-03-21 Perforation Treatment Performed - Cement Squeeze
1958-03-24 Perforation Treatment Performed - Acid Wash - No Pressure
1958-03-24 Perforation Treatment Performed - Jet Perforation
1958-04-16 Perforation Treatment Performed - Acid Wash - No Pressure
1958-06-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-05-08 Perforation Treatment Performed - Cement Squeeze
1959-05-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-05-16 Perforation Treatment Performed - Jet Perforation
1959-08-22 Perforation Treatment Performed - Cement Squeeze
1959-08-25 Perforation Treatment Performed - Jet Perforation
1959-08-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-11-24 Perforation Treatment Performed - Jet Perforation
1959-11-25 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-01-04 Well Began Injection
1960-01-04 Well Fluid changed to Water
1960-01-04 Well Type changed to Disposal
1966-03-03 Perforation Treatment Performed - Cement Plug
1966-03-08 Well Abandoned
1966-03-08 Well Fluid changed to Water
1966-03-08 Well Mode changed to Abandoned
1966-03-08 Well Type changed to Disposal
1987-10-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-04-02 Perforation 1613.90 1615.70 13
1958-03-24 Perforation 1602.90 1603.90 20
1958-03-24 Acid Wash 1602.90 1603.90 0
1958-04-16 Acid Wash 1602.90 1603.90 0
1958-06-26 Acid Treatment 1602.90 1603.90 0
1959-05-08 Cement Squeeze 1602.90 1603.90 0
1959-05-16 Perforation 1618.80 1621.20 13
1959-05-16 Acid Treatment 1618.80 1621.20 0
1959-08-22 Cement Squeeze 1618.80 1621.20 0
1959-08-25 Perforation 1633.40 1635.30 13
1959-08-26 Acid Treatment 1633.40 1635.30 0
1953-04-02 Acid Treatment 1613.90 1615.70 0
1959-11-24 Perforation 1628.50 1633.10 13
1959-11-25 Acid Treatment 1628.50 1633.10 0
1966-03-03 Cement Plug 1610.30 1638.90 0
1958-03-01 Cement Squeeze 1613.90 1615.70 0
1958-03-04 Perforation 1606.00 1608.40 13
1958-03-05 Acid Wash 1606.00 1608.40 0
1958-03-10 Cement Squeeze 1606.00 1608.40 0
1958-03-15 Perforation 1606.00 1607.20 13
1958-03-17 Acid Treatment 1606.00 1607.20 0
1958-03-21 Cement Squeeze 1606.00 1607.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0

For data sources see[5]

References