If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0494261501000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":53.223333,"lon":-113.71043,"icon":""}]} |
Location: 00/01-15-049-26W4/0 | |
Location Alias: 00/01-15-49-26 W4M | |
Location Alias 2: 00/01-15-049-26 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 049 | |
Meridian: 4 | |
Range: 26 | |
Section: 15 | |
County/Municipality: Leduc County | |
Well Name: WHITEHALL LEDUC NO. 1-15 | |
Operator Name: BP Canada Energy Group ULC | |
License Number: 0007260 | |
License Date: 1953-11-03 | |
License Status: RecExempt | |
Spud Date: 1953-11-30 | |
Final Drill Date: 1953-12-25 | |
Well Total Depth: 1626.40 m | |
Surface Hole Latitude: 53.223333 | |
Surface Hole Longitude: -113.710430 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1953-11-03 | Obtained License |
1953-12-25 | Finished Drilling |
1953-12-25 | Well Mode changed to Drilled and Cased |
1953-12-26 | Production Casing Operation Performed |
1953-12-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1953-12-30 | Perforation Treatment Performed - Bullet Perforation |
1954-01-01 | Well Began Production |
1954-01-01 | Well Fluid changed to Crude Oil |
1954-01-01 | Well Mode changed to Pumping |
1959-03-04 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1959-03-04 | Perforation Treatment Performed - Bullet Perforation |
1959-04-24 | Perforation Treatment Performed - Cement Plug |
1959-05-06 | Well Abandoned |
1959-05-06 | Well Fluid changed to Crude Oil |
1959-05-06 | Well Mode changed to Abandoned |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1953-12-30 | Bullet Perforation | 1618.20 | 1624.00 | 13 |
1953-12-30 | Acid Treatment | 1618.20 | 1624.00 | 0 |
1959-03-04 | Packing Device Capped w/Cement | 1615.40 | 1615.40 | 0 |
1959-03-04 | Bullet Perforation | 1214.90 | 1216.50 | 0 |
1959-04-24 | Cement Plug | 1214.60 | 1234.40 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[5]