X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494253010000

Well Details

Well ID: 0494253010000
Loading map...
Location: 00/10-30-049-25W4/0
Location Alias: 00/10-30-49-25 W4M
Location Alias 2: 00/10-30-049-25 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 30
County/Municipality: Leduc County
Well Name: MEC LEDUC-WB 10-30-49-25
Operator Name: NEP Canada ULC
License Number: 0006503
License Date: 1953-05-28
License Status: Suspension
Spud Date: 1953-06-19
Final Drill Date: 1953-07-08
Well Total Depth: 1629.20 m
Surface Hole Latitude: 53.260111
Surface Hole Longitude: -113.643986

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1953-05-28 Obtained License
1953-06-28 Drill Stem Test Performed
1953-07-03 Drill Stem Test Performed
1953-07-06 Liner Casing Operation Performed
1953-07-08 Finished Drilling
1953-07-08 Well Mode changed to Drilled and Cased
1953-07-12 Perforation Treatment Performed - Jet Perforation
1953-07-16 Well Began Production
1953-07-16 Well Fluid changed to Crude Oil
1953-07-16 Well Mode changed to Flowing
1974-11-28 Perforation Treatment Performed - Cement Squeeze
1974-12-02 Perforation Treatment Performed - Acid Wash - No Pressure
1974-12-02 Perforation Treatment Performed - Jet Perforation
1974-12-04 Perforation Treatment Performed - Cement Squeeze
1974-12-05 Perforation Treatment Performed - Cement Squeeze
1974-12-07 Perforation Treatment Performed - Jet Perforation
1974-12-09 Perforation Treatment Performed - Acid Wash - No Pressure
1976-05-20 Well Fluid changed to Crude Oil
1976-05-20 Well Mode changed to Pumping
1978-01-25 Perforation Treatment Performed - Cement Squeeze
1978-01-26 Perforation Treatment Performed - Jet Perforation
1978-01-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-17 Perforation Treatment Performed - Cement Squeeze
1982-11-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-19 Perforation Treatment Performed - Jet Perforation
1996-04-01 Well Fluid changed to Crude Oil
1996-04-01 Well Mode changed to Suspended
1997-08-12 Well Log Performed
1997-08-14 Well Log Performed
1998-01-03 Perforation Treatment Performed - Jet Perforation
1998-01-04 Perforation Treatment Performed - Cement Squeeze
1998-01-10 Perforation Treatment Performed - Cement Squeeze
1998-01-10 Well Log Performed
1998-01-11 Perforation Treatment Performed - Jet Perforation
1998-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-01-14 Perforation Treatment Performed - Jet Perforation
1998-01-15 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-09-27 Plug Back Performed
2000-09-28 Perforation Treatment Performed - Jet Perforation
2000-09-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2000-09-30 Perforation Treatment Performed - Fractured
2002-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-14 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1953-07-12 Perforation 1624.00 1625.50 13
1978-01-26 Perforation 1621.20 1621.80 7
1978-01-27 Acid Treatment 1621.20 1621.80 0
1982-11-17 Cement Squeeze 1621.20 1621.80 0
1982-11-19 Perforation 1616.50 1616.70 10
1982-11-19 Acid Treatment 1616.50 1616.70 0
1998-01-03 Perforation 1413.00 1415.00 18
1998-01-04 Cement Squeeze 1413.00 1415.00 0
1998-01-10 Cement Squeeze 1616.50 1616.70 0
1998-01-11 Perforation 1609.00 1610.00 13
1998-01-12 Acid Treatment 1609.00 1610.00 0
1974-11-28 Cement Squeeze 1624.00 1625.50 0
1998-01-14 Perforation 1605.50 1606.60 13
1998-01-15 Acid Treatment 1605.50 1606.60 0
2000-09-27 Packing Device Capped w/Cement 1592.00 1600.00 0
2000-09-28 Perforation 1316.70 1320.30 17
2000-09-29 Acid Treatment 1316.70 1320.30 0
2000-09-30 Fracture 1316.70 1320.30 0
2002-06-14 Packing Device Capped w/Cement 1299.00 1307.00 0
1974-12-02 Perforation 1621.20 1622.10 7
1974-12-02 Acid Wash 1621.20 1622.10 0
1974-12-04 Cement Squeeze 1621.20 1622.10 0
1974-12-05 Cement Squeeze 1621.20 1622.10 0
1974-12-07 Perforation 1623.10 1624.00 7
1974-12-09 Acid Wash 1623.10 1624.00 0
1978-01-25 Cement Squeeze 1623.10 1624.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 5056 0.0 0.0 0.0
1968 4760 0.0 0.0 0.0
1969 3666 0.0 0.0 0.0
1970 393 0.0 0.0 0.0
1972 978 0.0 0.0 0.0
1973 7604 0.0 0.0 0.0
1974 7907 0.0 0.0 0.0
1975 7816 0.0 0.0 0.0
1976 7912 0.0 0.0 0.0
1977 4686 0.0 0.0 0.0
1978 6827 0.0 0.0 0.0
1979 7934 0.0 0.0 0.0
1980 4907 0.0 0.0 0.0
1981 2676 0.0 0.0 0.0
1982 636 0.0 0.0 0.0
1983 7688 0.0 0.0 0.0
1984 7410 0.0 0.0 0.0
1985 7498 0.0 0.0 0.0
1986 8315 0.0 0.0 0.0
1987 8210 0.0 0.0 0.0
1988 8060 0.0 0.0 0.0
1989 7776 0.0 0.0 0.0
1990 8174 0.0 0.0 0.0
1991 8296 0.0 0.0 0.0
1992 7992 0.0 0.0 0.0
1993 7982 0.0 0.0 0.0
1994 7971 0.0 0.0 0.0
1995 2844 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1998-01-14 No Incident Encountered 0.00 0.00

For data sources see[6]

References