X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494253002000

Well Details

Well ID: 0494253002000
Loading map...
Location: 00/02-30-049-25W4/0
Location Alias: 00/02-30-49-25 W4M
Location Alias 2: 00/02-30-049-25 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 30
County/Municipality: Leduc County
Well Name: FARGO-SCHULTZ 2-30
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0003299
License Date: 1951-08-09
License Status: RecCertified
Spud Date: 1951-08-26
Final Drill Date: 1951-09-24
Well Total Depth: 1582.20 m
Surface Hole Latitude: 53.252443
Surface Hole Longitude: -113.643954

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1951-08-09 Obtained License
1951-09-20 Drill Stem Test Performed
1951-09-23 Drill Stem Test Performed
1951-09-24 Drill Stem Test Performed
1951-09-24 Finished Drilling
1951-09-24 Well Mode changed to Drilled and Cased
1951-09-25 Drill Stem Test Performed
1951-09-26 Liner Casing Operation Performed
1951-09-28 Perforation Treatment Performed - Open-Hole Completion
1951-09-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-09-30 Well Began Production
1951-09-30 Well Fluid changed to Crude Oil
1951-09-30 Well Mode changed to Flowing
1951-10-03 Perforation Treatment Performed - Acid Wash - No Pressure
1951-10-08 Perforation Treatment Performed - Acid Wash - No Pressure
1951-10-14 Perforation Treatment Performed - Cement Squeeze
1951-10-17 Perforation Treatment Performed - Bullet Perforation
1951-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-10-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-10-23 Perforation Treatment Performed - Cement Squeeze
1951-11-01 Perforation Treatment Performed - Cement Squeeze
1951-11-02 Perforation Treatment Performed - Bullet Perforation
1951-11-03 Perforation Treatment Performed - Acid Wash - No Pressure
1951-11-04 Perforation Treatment Performed - Acid Wash - No Pressure
1951-11-04 Perforation Treatment Performed - Jet Perforation
1951-12-04 Perforation Treatment Performed - Cement Squeeze
1951-12-07 Perforation Treatment Performed - Jet Perforation
1951-12-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-12-11 Perforation Treatment Performed - Bullet Perforation
1951-12-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-02-09 Well Fluid changed to Crude Oil
1952-02-09 Well Mode changed to Pumping
1956-08-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1956-08-20 Perforation Treatment Performed - Bullet Perforation
1961-04-28 Perforation Treatment Performed - Cement Squeeze
1961-05-01 Perforation Treatment Performed - Jet Perforation
1961-05-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1964-09-21 Well Fluid changed to Crude Oil
1964-09-21 Well Mode changed to Suspended
1967-07-24 Perforation Treatment Performed - Cement Plug
1967-07-25 Well Abandoned
1967-07-25 Well Fluid changed to Crude Oil
1967-07-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-09-28 Open Hole/Barefoot Completion 1554.50 1580.40 0
1951-10-23 Cement Squeeze 1577.00 1579.50 0
1951-11-01 Cement Squeeze 1570.90 1574.60 0
1951-11-02 Bullet Perforation 1567.30 1568.50 13
1951-11-03 Acid Wash 1567.30 1568.50 0
1951-11-04 Perforation 1567.00 1568.80 13
1951-11-04 Acid Wash 1567.00 1568.80 0
1951-12-04 Cement Squeeze 1567.00 1568.80 0
1951-12-07 Perforation 1567.00 1568.80 13
1951-12-09 Acid Treatment 1567.00 1568.80 0
1951-12-11 Bullet Perforation 1570.60 1572.50 13
1951-09-30 Acid Treatment 1554.50 1580.40 0
1951-12-13 Acid Treatment 1570.60 1572.50 0
1956-08-20 Bullet Perforation 1567.00 1568.80 13
1956-08-20 Bullet Perforation 1570.60 1572.50 13
1956-08-20 Acid Treatment 1567.00 1572.50 0
1961-04-28 Cement Squeeze 1567.00 1572.50 0
1961-05-01 Perforation 1556.60 1561.20 13
1961-05-02 Acid Treatment 1556.60 1561.20 0
1967-07-24 Cement Plug 1502.70 1563.60 0
1951-10-03 Acid Wash 1554.50 1580.40 0
1951-10-08 Acid Wash 1554.50 1580.40 0
1951-10-14 Cement Squeeze 1554.50 1580.40 0
1951-10-17 Bullet Perforation 1570.90 1574.60 13
1951-10-17 Bullet Perforation 1577.00 1579.50 13
1951-10-18 Acid Treatment 1570.90 1579.50 0
1951-10-20 Acid Treatment 1570.90 1579.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0

For data sources see[5]

References