X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494252004000

Well Details

Well ID: 0494252004000
Loading map...
Location: 00/04-20-049-25W4/0
Location Alias: 00/04-20-49-25 W4M
Location Alias 2: 00/04-20-049-25 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 20
County/Municipality: Leduc County
Well Name: SKYLINE, NEW DEVON, BANNER NO. 4-20
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0005074
License Date: 1952-07-28
License Status: RecCertified
Spud Date: 1952-07-26
Final Drill Date: 1952-08-14
Well Total Depth: 1594.10 m
Surface Hole Latitude: 53.237814
Surface Hole Longitude: -113.631585

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1952-07-28 Obtained License
1952-08-12 Drill Stem Test Performed
1952-08-14 Drill Stem Test Performed
1952-08-14 Finished Drilling
1952-08-14 Well Mode changed to Drilled and Cased
1952-08-16 Production Casing Operation Performed
1952-08-20 Perforation Treatment Performed - Jet Perforation
1952-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1952-08-28 Well Began Production
1952-08-28 Well Fluid changed to Crude Oil
1952-08-28 Well Mode changed to Flowing
1958-07-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-08-12 Perforation Treatment Performed - Cement Squeeze
1959-09-05 Perforation Treatment Performed - Jet Perforation
1959-09-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1959-09-12 Well Fluid changed to Crude Oil
1959-09-12 Well Mode changed to Pumping
1960-03-17 Well Fluid changed to Crude Oil
1960-03-17 Well Mode changed to Suspended
1961-03-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1961-03-15 Well Fluid changed to Crude Oil
1961-03-15 Well Mode changed to Pumping
1962-07-07 Perforation Treatment Performed - Bullet Perforation
1962-07-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1962-07-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1965-07-15 Well Fluid changed to Crude Oil
1965-07-15 Well Mode changed to Suspended
1968-01-17 Perforation Treatment Performed - Cement Plug
1968-01-25 Well Abandoned
1968-01-25 Well Fluid changed to Crude Oil
1968-01-25 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1952-08-20 Perforation 1563.30 1565.50 13
1959-09-05 Perforation 1577.90 1578.90 7
1959-09-05 Perforation 1579.80 1580.70 7
1959-09-05 Perforation 1582.20 1583.40 7
1959-09-05 Perforation 1584.70 1585.60 7
1959-09-06 Acid Treatment 1571.20 1585.60 0
1959-09-11 Acid Treatment 1571.20 1585.60 0
1961-03-15 Acid Treatment 1571.20 1585.60 0
1962-07-07 Bullet Perforation 1579.20 1581.30 7
1962-07-08 Acid Treatment 1579.20 1581.30 0
1962-07-09 Acid Treatment 1579.20 1581.30 0
1952-08-20 Perforation 1569.40 1572.50 13
1968-01-17 Cement Plug 1539.20 1587.40 0
1952-08-20 Perforation 1576.70 1578.60 13
1952-08-20 Perforation 1581.90 1585.00 13
1952-08-21 Acid Treatment 1563.30 1585.00 0
1958-07-28 Acid Treatment 1563.30 1585.00 0
1959-08-12 Cement Squeeze 1563.30 1585.00 0
1959-09-05 Perforation 1571.20 1572.20 7
1959-09-05 Perforation 1572.80 1573.70 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References