X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494251906000

Well Details

Well ID: 0494251906000
Loading map...
Location: 00/06-19-049-25W4/0
Location Alias: 00/06-19-49-25 W4M
Location Alias 2: 00/06-19-049-25 W4/00
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 19
County/Municipality: Leduc County
Well Name: CENTRAL DEL RIO HEARD NO. 1 WELL
Operator Name: Ovintiv Canada ULC
License Number: 0002480
License Date: 1950-12-28
License Status: RecCertified
Spud Date: 1951-01-08
Final Drill Date: 1951-02-01
Well Total Depth: 1610.30 m
Surface Hole Latitude: 53.241399
Surface Hole Longitude: -113.649932

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-12-28 Obtained License
1951-01-31 Drill Stem Test Performed
1951-02-01 Drill Stem Test Performed
1951-02-01 Finished Drilling
1951-02-01 Well Mode changed to Drilled and Cased
1951-02-04 Production Casing Operation Performed
1951-02-09 Perforation Treatment Performed - Bullet Perforation
1951-02-11 Drill Stem Test Performed
1951-02-13 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-02-16 Perforation Treatment Performed - Cement Squeeze
1951-02-18 Well Began Production
1951-02-18 Well Fluid changed to Crude Oil
1951-02-18 Well Mode changed to Flowing
1951-02-20 Perforation Treatment Performed - Bullet Perforation
1951-02-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1951-02-21 Perforation Treatment Performed - Acid Wash - No Pressure
1958-01-09 Well Fluid changed to Crude Oil
1958-01-09 Well Mode changed to Pumping
1966-08-23 Well Fluid changed to Crude Oil
1966-08-23 Well Mode changed to Suspended
1967-09-28 Perforation Treatment Performed - Cement Plug
1967-09-28 Well Abandoned
1967-09-28 Well Fluid changed to Crude Oil
1967-09-28 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1951-02-09 Bullet Perforation 1580.10 1583.70 20
1967-09-28 Cement Plug 1561.80 1610.30 0
1951-02-09 Bullet Perforation 1587.40 1589.50 20
1951-02-09 Bullet Perforation 1592.00 1594.10 20
1951-02-09 Bullet Perforation 1597.20 1602.00 20
1951-02-13 Acid Treatment 1580.10 1594.10 0
1951-02-16 Cement Squeeze 1580.10 1602.00 0
1951-02-20 Bullet Perforation 1586.80 1594.70 13
1951-02-21 Acid Wash 1586.80 1594.70 0
1951-02-21 Acid Treatment 1586.80 1594.70 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0

For data sources see[5]

References