X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0494251801002

Well Details

Well ID: 0494251801002
Loading map...
Location: 00/01-18-049-25W4/2
Location Alias: 00/01-18-49-25 W4M
Location Alias 2: 00/01-18-049-25 W4/02
Country: Canada
Province: Alberta
Township: 049
Meridian: 4
Range: 25
Section: 18
County/Municipality: Leduc County
Well Name: DECALTA LEDUC 1-18-49-25
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0051857
License Date: 1974-11-15
License Status: Abandoned
Spud Date: 1974-11-19
Final Drill Date: 1974-11-29
Well Total Depth: 1603.90 m
Surface Hole Latitude: 53.223285
Surface Hole Longitude: -113.637773

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-11-15 Obtained License
1974-11-29 Finished Drilling
1974-11-30 Perforation Treatment Performed - Jet Perforation
1974-12-03 Perforation Treatment Performed - Jet Perforation
1974-12-04 Perforation Treatment Performed - Cement Squeeze
1974-12-06 Perforation Treatment Performed - Cement Squeeze
1974-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-12-12 Perforation Treatment Performed - Jet Perforation
1974-12-14 Perforation Treatment Performed - Cement Squeeze
1974-12-16 Perforation Treatment Performed - Jet Perforation
1974-12-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1974-12-20 Perforation Treatment Performed - Fractured
1975-01-04 Perforation Treatment Performed - Cement Squeeze
1975-01-04 Perforation Treatment Performed - Jet Perforation
1975-01-08 Perforation Treatment Performed - Jet Perforation
1975-01-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-01-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-05-21 Well Mode changed to Drilled and Cased
1989-05-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-05-30 Perforation Treatment Performed - Jet Perforation
1989-05-30 Plug Back Performed
1989-05-30 Well Mode changed to Abandoned
1989-05-31 Perforation Treatment Performed - Remedial Casing
1989-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1989-06-01 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1974-11-30 Perforation 941.80 942.10 7
1974-12-20 Fracture 908.60 910.70 0
1975-01-04 Perforation 630.90 631.20 13
1975-01-04 Cement Squeeze 630.90 631.20 0
1975-01-08 Perforation 624.80 626.70 7
1975-01-10 Acid Treatment 624.80 626.70 0
1975-01-14 Acid Treatment 624.80 626.70 0
1989-05-30 Packing Device Capped w/Cement 629.00 637.00 0
1989-05-30 Packing Device Capped w/Cement 610.00 618.00 0
1989-05-30 Perforation 200.00 201.00 13
1989-05-31 Remedial Casing Cementing 200.00 201.00 0
1974-12-03 Perforation 762.90 763.20 7
1989-06-01 Packing Device Capped w/Cement 190.00 198.00 0
1974-12-04 Cement Squeeze 941.80 942.10 0
1974-12-06 Cement Squeeze 762.90 763.20 0
1974-12-12 Perforation 908.60 910.70 7
1974-12-12 Acid Treatment 908.60 910.70 0
1974-12-14 Cement Squeeze 908.60 910.70 0
1974-12-16 Perforation 908.60 910.70 7
1974-12-17 Acid Treatment 908.60 910.70 0

For data sources see[4]



References